TaiLexi AI U.S. Case Law

Hope Natural Gas Company v. Federal Power Commission

HOPE NATURAL GAS COMPANY, Petitioner, v. FEDERAL POWER COMMISSION, Respondent

Hope Natural Gas Co. v. Fed. Power Comm'n, 197 F.2d 522 (4th Cir. 1952)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Court of Appeals for the Fourth Circuit · U.S. Courts of Appeals
Decided
June 18, 1952
Docket
No. 6365
Judges
Parker, Soper, Dobie
Citations
197 F.2d 5221952 U.S. App. LEXIS 2647

Opinion — Per Curiam

PER CURIAM.

A petition for rehearing has been filed in this case but it presents no point that has not been fully considered. Criticism is made of two sentences of the opinion which are taken out of context; but we think there is no ground for criticism when they are properly considered in connection with what precedes and follows them. Nothing said in the opinion amounts to a holding that a rate making body may approve confiscatory rates because of profits made in a prior period. What we held was that maintenance of an existing rate and suspension of a proposed rate during a reasonable period of investigation may not be condemned as confiscatory. The statement that “losses of one period must be counterbalanced against gains of another in any fair consideration of the i;ate making procedure” had reference, not to the fixing of rates by a rate making body, but to the judging of the constitutionality of a statute authorizing the suspension of proposed rates and the continuance of existing rates during a reasonable period of investigation. This is made perfectly clear by the succeeding paragraph of the opinion which is as follows:

“It is true, of course, that a utility ■ is entitled to rates that are just and reasonable; but this is not to say that rates must fluctuate automatically with every change in economic conditions or that a reasonable time may-not be allowed for determining the reasonableness of a proposed increase in rates before it is allowed to go into effect.. Any loss sustained by a maintenance of the status quo while such determination is being made is properly considered, not as a violation of constitutional right, but as a necessary incident of rate regulation so long as the period of suspension does not ‘overpass the bounds of reason.’ See American Telephone & Telegraph Co. v. United States, 299 U.S. 232, 247 , 57 S.Ct. 170, 177 , 81 L.Ed. 142 ; Federal Power Commission v. East Ohio Gas Co., 338 U.S. 464, 475 , 70 S.Ct. 266 , 94 L.Ed. 268 . It is not contended, nor could it reasonably be, that the' five months *523 suspension period allowed by the statute is so unreasonable as to amount to a denial of due process. As pointed out by Senator Elkins with respect to the suspension provision of the Mann-Elkins Act, a limited period of suspension pending an investigation of proposed increases is ‘a reasonable limitation upon the exercise of the property rights of the carrier (utility) in fixing a rate.’ 45 Cong.Record 3472.” The petition for rehearing will be denied. Rehearing denied.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1972: 11975: 119722026peak 1972 · 1

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 2

DepthCaseCited by
Am. Tel. & Tel. Co. v. United States, 299 U.S. 232 (1936) 178
Fed. Power Comm'n v. East Ohio Gas Co., 338 U.S. 464 (1950) 75

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list