The-city of Buffalo- employed the ■ plaintiff to pave a street and to furnish sand, for that - purpose under a contract by which it was to grade the street, and-the work of paving, &c., was to be performed under the direction óf its street commissioner. The city'so excavated the street' as' that '' a'quaiiiity of sand’ beyond- that-specified in the" contract was necessary to bring up the pavibg to the grade ■ established, and the plaintiff, by direc- ; tian of the- street commissioner, furnished the excess required: HA&y that he was entitled to compensation therefor by the city, Íbe" authority of thé corporation: is to be implied from its having, by its own Abt,rendered ihe- éxtra rhatérial- 'He'césSáry-to conform the- work t.o the ''conditions-of .ffiWeoMracti
Summary
.Appeal from the Supreme Court. Action for extra materials furnished by the plaintiff in paving a street under a contract with the defendant. The trial was before a referee, who found these facts : The city contracted with the plaintiff to sand and pave Clim ton street. The grading of the street was to be done by the city. The contract provided that the street should be graded to a sufficient depth to receive eighteen inches of lake sand next to and underneath the' paving stone; which sand was to be furnished by the plaintiff, and to be of a uniform depth of eighteen inches under all the stone in the street. The work was to be done under the direction of the street commissioner and the committee on streets, or of such other person as they might appoint to superintend it. The plaintiff proceeded to execute his contract, and the work of grading and forming the street, by the city, went on simultaneously. It excavated to such a depth that eighteen inches of sand under the stones would not bring the street up to the grade established, but it required an average depth of twenty-two inches. The effect, therefore, of complying strictly with that part of the contract in relation to the depth of the sand underneath the pavement, was to drop the street below the grade fixed by the defendant; and this the plaintiff informed the street commissioner, the chairman of the street committee of the common council, and the city surveyor, that he must do. They all directed him not to drop the street, but to furnish the extra sand to bring it up to the established grade. He furnished and deposited in the street 616 extra yards of lake sand to bring the same .up to the grade, at a cost of $462. It did not appear that the common council had knowledge that the plaintiff was furnishing the extra sand while the work under the contract was progressing, unless it might be inferred from the fact that the chairman of the street committee knew of and directed it. The city paid for the work at the price named in the contract, but refused to pay for the extra sand furnished, and this action was brought. The referee decided that the city was not liable. The judgment entered for the defendant on his report was affirmed at general term in the eighth district, and the plaintiff appealed to this court.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Wright

Wright, J.

The defendant is not liable if it did not, as a municipal corporation, contract with or authorize in any way the plaintiff to furnish the additional sand required to bring up the street to the grade which it had itself established. Un doubtedly, though a municipal corporation be charged with the duty of regulating and repairing the streets, no action will lie against such corporation for repairs put upon them without its assent or authority. It may be doubted, however, whether, in all cases, to make the city of Buffalo liable for work done in improving its streets, its common council must necessarily contract for the doing of such work, and that none other of its agents or officers have any authority in the premises. But assuming that the authority is only with the common council, the same power that contracts may assent to vary or modify the contract. That I think was in effect done in this case. It does not seem to be a case where a contractor, not content with his contract, colludes with the subordinate officers of the corporation to obtain more than the price for which he has agreed to do the work, in the way of extra compensation. It is rather one where extra labor was required to be performed by the contractor in the fulfillment of his contract, because of an act of the corporation itself, and which the contractor could not control.

The contract of the plaintiff was to pave the street, and put underneath the pavement eight inches of lake sand, for which he was to receive a stipulated compensation. He had nothing to do with forming or grading the street, but that was the business of the city. The city did form and grade it in such a way as that it was impossible for the plaintiff to comply with the contract in regard to paving according to the established grade, *199 and also in regard to the quantity of sand. The city had contracted for eighteen inches of sand under the pavement; but subsequently excavated and graded the street in such a way as to require twenty-two inches. That the pavement should be brought up to the established grade was the important point, and for the interest of the defendant, as the paving would otherwise have been’ useless. I think, therefore, that the city, in effect, consented to vary the contract in regard to the quantity, of sand to be furnished. It was not necessary that such assent should be expressed by a formal resolution of the common council, but it may be implied from its acts relating to the particular work subsequent to entering into contract with the plaintiff.

It is urged that when the plaintiff found that he could not, fulfill his contract in all its particulars, he should have obtained the action of the common council before commencing or continuing the work. This could not have been absolutely required to enable him to recover. The corporation had authorized the street commissioner to make the contract, and the contract made provided that the work should be done under the direction of such commissioner. This plainly intended that, the street commissioner might direct in regard to variations rendered necessary by the action of the city authorities. Had the plaintiff insisted on doing the work in precise accordance with his contract, the street commissioner could have prevented it, or at least it would have been his duty to present the matter to the common council. Instead of doing this, however, he directed that the street should not be dropped below, but that extra sand must be furnished by the plaintiff to keep it at the grade.

Under the facts found, I am of the opinion that the plaintiff should have recovered. The city must be deemed to have impliedly assented to the alteration of the contract in respect to the quantity of sand to be furnished.

The judgment of the Supreme Court should be reversed, and a new trial ordered, with costs to abide the event.

*200 Comstock, Ch. J., Selden, Denio, Bacon and1 Welles, Js., concurred; Davies and Clerke, Js., dissented, and were for affirming the judgment.

Judgment reversed.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

Cited by 23 cases

View all citing references →
1865–1866: 31867–1868: 11869–1870: 21877–1878: 21887–1888: 11895–1896: 11897–1898: 11899–1900: 21901–1902: 11903–1904: 11905–1906: 11907–1908: 21917–1918: 11919–1920: 11929–1930: 11943–1944: 11945–1946: 118652026peak 1865 · 3

Relies on it most ⓘ

  1. Shore Bridge Corp. v. State186 Misc. 1005 (1946)
  2. M. L. Ryder Building Co. v. City of Albany187 A.D. 868 (1919)
  3. Becker v. City of New York68 N.E. 855 (N.Y. 1903) · Dissent
  4. Todd Dry Dock, Engineering & Repair Corp. v. City of New York33 F.2d 541 (E.D.N.Y. 1929)
  5. Horgan v. Mayor of New York21 A.D. 405 (1897)
  6. Langley v. Rouss77 N.E. 1168 (N.Y. 1906)

Most recent

  1. Shore Bridge Corp. v. State186 Misc. 1005 (1946)
  2. Haley v. Brady137 P.2d 505 (Wash. 1943)
  3. Todd Dry Dock, Engineering & Repair Corp. v. City of New York33 F.2d 541 (E.D.N.Y. 1929)
  4. M. L. Ryder Building Co. v. City of Albany187 A.D. 868 (1919)
  5. Barker v. City of New York242 F. 350 (2d Cir. 1917)
  6. Kerker v. Bocher1908 OK 52, 95 P. 981

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 0

No citations to other opinions in this database were found.

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list