TaiLexi AI U.S. Case Law

Haight v. Price

Haight v. . Price.

Haight v. Price, 21 N.Y. 241 (1860)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
New York Court of Appeals · State Highest Courts
Decided
March 5, 1860
Judges
Dehio
Citations
21 N.Y. 241
Headnotes
The plaintiff of whose title there was no evidence except possession for six years, during that time acquiesced, and his predecessors in the possession had for ten years previously acquiesced, in the diversion of a watercourse by the occupant of land higher up the stream. In an action for damages from such diversion: Held, That no acquiescence short of twenty years repels the presumption that the diversion of a water-course was in hostility to the rights of the riparian proprietors, or authorizes the presumption either of grant or of license. The plaintiff is not put to any proof of the circumstances under which thp diversion began, or who was the owner of the premises affected, but may rest on the principle that a diversion is to be deemed wrongful in the absence of proof establishing the right affirmatively. That the premises injured by the diversion, and those on which' it'-was made? were then held by the same owner, and "the plaintiff came into possession under his title, in subordination to his right to continue the diversion, or as an intruder, are facts, the burden of'proving which is on the defendant, and which cannot be presumed in his favor. A part of the injury resulting to the plaintiff from the destruction of an aqueduct erected by the defendant to lessen the effect.of the diversion; it is no defence that such destruction was caused in part by a dam built by the plaintiff on his own land, which would have produced no injury at the place of the defendant’s aqueduct, if the channel had there remained ' in its natural condition.
Summary
Appeal from the Supreme Court. Action for diverting the water of a stream called Trout run, in Arcadia, Wayne county, by means of a mill dam, whereby the plaintiff, as he alleged, was deprived of the use of the water for the supply of his brick-yard situated on his land at a point lower down the stream. The defendant erected a grist mill on the stream in the year 1836. To obtain the necessary water power he built a dam across the stream, discharging the water, after it had passed through his works, by the tail-race, at a lower level than the bottom of the original channel, and conducting it, by means of an artificial ditch running across the natural channel, in such a direction as to divert it from the plaintiff’s premises on which the brick-yard was situated. If the diversion had been entire, the channel where it passed through the plaintiff’s premises would have been dry; but at the place where the ditch crossed the former channel, four or five feet below its bottom, the plaintiff constructed an aqueduct which continued the former waterway, so that the surplus water which wasted from the dam and sontinued to run in the old channel, and that which was brought down by floods, would still flow past the point where the ditch crossed the channel, and would be available to the plaintiff for the use of his brick-yard lower down; and it was sufficient for Ms purpose, except in the dry portions of each summer, for about three years before the trial, when the plaintiff’s supply of water was deficient. On these occasions the plaintiff was accustomed to apply to the defendant’s miller to let more water run down the old channel, which request was sometimes complied with and sometimes refused. In March, 1852, which was sometime before the commencement of the action, .the banks of the stream at each end of the aqueduct were washed away, and the stream passed entirely into the ditch, and all the water was conducted away from the plaintiff’s premises. The plaintiff, at some expense, afterwards procured water by means of pumps which were used to raise it from the ditch into the old channel in which it came down to the brick-yard. The plaintiff’s claim was to recover for the diminished supply prior to this occurrence, and for the entire lack of water afterwards, and the expense of the pumps. It appeared that the brick-yard was formed in 1832 or 1833, and had been used for the manufacturing of bricks since that time; and that the plaintiff went into possession of it five or six years before the trial. The nature of his title, and his connection, if any, with the former possessor, was not shown. The stream passed on to and run upon the land which was in possession of the plaintiff at a convenient distance from the brickyard, and the latter had been supplied with water from the channel. In order to accumulate and retain the water for convenient use opposite the brick-yard, the plaintiff had excavated a sort of basin in' his channel, and had thrown a slight dam across it a short distance below, and upon the top of the dam had built a fence. The defendant gave evidence tending to show that the carrying off the aqueduct, in the spring of 1852, was caused by the operation of the plaintiff’s dam in hindering the natural flow of the water, and setting it back upon the aqueduct and the adjacent banks, by means of which, as it was claimed, they gave way, and the water was thereby turned into the ditch. This was answered by evidence on the part of the plaintiff tending to show that his dam had been carried away by high water the preceding autumn, and consequently was not existing when the aqueduct went off; and also to show that the timber of the aqueduct had become impaired by age, and that its destruction arose from that cause, and also from the fault of the defendant in permitting rubbish from above to float down against it. It appeared that the defendant had remonstrated against the continuance of the dam as likely to injure the defendant and carry off the aqueduct, and that the plaintiff had sometimes taken his dam down on occasions of high water. After the aqueduct was carried -away, the defendant at first promised the plaintiff to repair it; but upon being afterwards applied to by the plaintiff, he declined to do it. The judge charged the jury, in effect, that the plaintiff had a right to the use of the waters of the stream in their natural channel upon the premises occupied by him as a brick-yard, and was entitled to recover any damages he had sustained by being deprived of them by any act of the defendant in diverting the stream, by means of the ditch mentioned in the evidence; and that there was no proof in the case upon which to raise the presumption of a grant or license to the defendant to divert the water in the manner he had done, nor that the plaintiff entered into the possession of the briclc-yard premises in subordination to a right in the defendant to use the water in the manner mentioned. He also charged them that if the plaintiff’s dam caused or contributed to the carrying away of the aqueduct, that circumstance constituted no defence unless it also appeared that his dam was maintained at so high an elevation that if the stream had remained in its natural state some injury would have been occasioned to the banks on account thereof. The defendant’s counsel excepted to the several propositions of the charge. The jury gave a verdict for the plaintiff for $200. ' After an affirmance of the judgment at the general term, the defendant appealed here.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Dehio

Dehio, J.

The plaintiff’s possession of the land on which his brick-yard was situated, and through which the water-course *245 ran, was prima facie evidence of ownership in him. As such owner he was presumptively entitled to have the stream run in its natural channel, without obstruction or diversion. It is true that when he went into possession he found that the water had been diverted by the defendant’s dam above; and it is to be inferred that such diversion had been acquiesced in by the parties who had preceded him in the possession, and such acquiescence was continued on his part until the commencement of this action. But the whole period, during which the several successive proprietors forbore to assert their right to have the water returned to its natural channel, was not sufficient to raise the presumption of a title so to divert it. But the plaintiff did not show any privity between himself and the former possessors, or explain how it happened that the defendant was permitted to make the diversion, at the time it was first effected, some twelve or thirteen years before the plaintiff went into possession; and hence it is averred by the- defendant’s counsel that the jury might have presumed, if the question had been submitted to them, that the defendant was himself at that time the owner of the premises now possessed by the plaintiff, in which case he would have had a right to divert the water as there would have been no one entitled to object; and if the plaintiff subsequently took title under him, he would have held in subordination to the defendant’s right to continue the diversion. It is urged that this presumption should attach in the absence of any proof to the contrary, because the plainfiff holds the affirmative in this action, and because, moreover, everything must be deemed to have been rightfully and lawfully' done unless the contrary- be shown. This reasoning is not satisfactory to my mind. Assuming that the defendant’s ownership of both parcels at the time he diverted the stream from the lower one, would have concluded his subsequent grantee of that parcel, the suggested unity of ownership was a fact which the defendant was bound to prove on his- own part. The diversion was prima facie a wrong, and though in its nature it was capable of excuse or justification, by proof of the existence of other ■facts which would render it lawful, the burden of showing the *246 existence of such facts was upon the defendant. It is as easy to suppose that the person who owned the brick kiln lot when» the defendant’s mill was built, granted to the defendant the right to divert the water, as to conjecture that the diversion was a lawful act, on account of the ownership at that time of both parcels in the defendant; and yet it is clear that a jury would not be authorized to find a grant upon the evidence in this easel No doubt there is an inference of some weight arising out of an acquiescence in such an act for a considerable length of time, short of the period of prescription, that a justification of some sort existed; but the law, upon motives of policy, and to avoid uncertainty and the hazard of contradictory determination, has fixed upon the period of twenty years as the shortest time for admitting the presumption of a grant. Where a diversion has not continued for that period, it is considered hostile to the rights of the parties entitled to have the stream run in its natural channel. Stress is laid upon the circumstance that the plaintiff has not connected himself with the title of the party in possession when the diversion took place; and we are, in effect, asked to intend from this that the then owner was a stranger to the plaintiff’s title, but that he in some legal manner consented to the act of the defendant. But as the plaintiff’s possession entitled him to be considered the owner, the legal intendment is that he derived his title from some former owner. If he was an intruder upon the lands of another person, and that other, or his predecessor in the title, had granted the right to divert the water to the defendant, these being affirmative positions, it was for the defendant to prove their existence on his own part.

The circumstance, that the plaintiff and his predecessors in the possession had received the diminished supply of water for nearly twenty years, did not legally tend to show a license; for if the deprivation had been total it would not have had that effect. The same may be said of the evidence that the plaintiff took down his dam in time of high water. He had no right to keep up such an obstruction at such a time if it tended to overflow the lands of the proprietors on the stream above.

*247 Upon the whole this seems to me the common case of an unlawful diversion of water for a period a little short of that which would enable the jury to presume a consent, and that it would have been erroneous to submit it to the jury to find either a grant or license.

The other branch of the charge was also correct. The aqueduct was an artificial structure erected by the defendant to enable him to divert the principal part of the water of the stream, and yet to conduct the remainder down the natural bed of the stream. The plaintiff had a right to have the whole ■ stream pass that point of its course in its natural bed, and he did'no wrong to any one in erecting a dam on his own land below, provided it was such a one as would not have caused any injury to the defendant provided he had not interfered with the natural channel. This was the aspect in which the judge submitted the case.

The judgment must be affirmed.

Sellen and Davies, Js., expressed no opinion; all the other judges concurring, Judgment affirmed.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1866–1867: 11878–1879: 11884–1885: 11886–1887: 21890–1891: 21912–1913: 11916–1917: 118662026peak 1886 · 2

Relies on it most ⓘ

  1. Mueller v. Fruen30 N.W. 886 (Minn. 1886)
  2. City of Logansport v. Uhl99 Ind. 531 (1885)
  3. New York Rubber Co. v. Rothery14 N.E. 269 (N.Y. 1887)
  4. Bristol Hydraulic Co. v. Boyer67 Ind. 236 (1879)
  5. Knox v. Metropolitan Elevated Railway Co.12 N.Y.S. 848 (N.Y. Sup. Ct. 1890)
  6. Hughes v. Metropolitan Elevated Railway Co.28 N.E. 765 (N.Y. 1891)

Most recent

  1. In re the Judicial Settlement of the Accounts of Cushman16 Mills Surr. 389 (N.Y. Sur. Ct. 1916)
  2. Shearer v. Hutterische Bruder Gemeinde134 N.W. 63 (S.D. 1912)
  3. Hughes v. Metropolitan Elevated Railway Co.28 N.E. 765 (N.Y. 1891)
  4. Knox v. Metropolitan Elevated Railway Co.12 N.Y.S. 848 (N.Y. Sup. Ct. 1890)
  5. New York Rubber Co. v. Rothery14 N.E. 269 (N.Y. 1887)
  6. Mueller v. Fruen30 N.W. 886 (Minn. 1886)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 0

No citations to other opinions in this database were found.

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list