TaiLexi AI U.S. Case Law

First National Bank of Akron v. William F

FIRST NATIONAL BANK OF AKRON, Plaintiff-Appellee, v. William F. CANN and Building and Equipment Corporation of America, Defendants and Third Party Plaintiffs-Appellants, v. Harold S. CASSIDY, Et Al., Third-Party Defendants

First Nat'l Bank of Akron v. William F, 669 F.2d 415 (1st Cir. 1982)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Court of Appeals for the First Circuit · U.S. Courts of Appeals
Decided
January 28, 1982
Docket
No. 80-3484
Judges
Martin, Merritt, Per Curiam, Phillips
Citations
669 F.2d 4151982 U.S. App. LEXIS 22262

Opinion — Per Curiam

PER CURIAM.

William Cann and Building and Equipment Corporation challenge a judgment of $200,722.03 in favor of First National Bank for breach of contract. Cann is a licensed architect. He is also the president of BEC, a building and contracting consulting firm. On November 3, 1966, the Bank hired BEC as a consultant for a project to renovate the Bank’s main building in Akron, Ohio. BEC and Cann developed a plan which the Bank accepted. The Bank then retained BEC as construction manager for the project, which was eventually completed in November, 1969.

The renovation plans called for construction of a granite facing on the building’s south and southwest walls. The facing consists of numerous granite panels, supported at each floor by steel shelf angles. Seams between the panels are filled with mortar, which in turn is covered with caulking sealant. Late in 1976 the Bank’s building manager noticed that the caulking had separated and that several granite panels had loosened from the facing. In the spring of 1977, the Bank asked various firms to inspect the facing and to submit bids for its repair. The successful bidder began work but soon discovered a problem with the facing. The Bank then retained an engineering firm, which diagnosed a dangerous condition: the loose panels were laterally unstable. Extensive repairs were required, undertaken, and completed in May, 1978.

The Bank sued appellants on May 11, 1978 to recover the cost of repair. After a bench trial, the District Court held appellants jointly and severally liable for breach of contract in: 1) failing to install the caulking properly; 2) failing to supervise the project adequately; and 3) breaching an express warranty that the actual work would correspond to the plans.

1

The court rejected the Bank’s negligence claims.

Appellants raise three contentions before this court: 1) the Bank’s contract claims are barred by its failure to give Cann and BEC a written notice of claims, as specified in the parties’ contract; 2) the claims are barred by the Bank’s failure to notify appellants promptly of the defects; and 3) the bank is entitled only to nominal damages, for it failed to prove actual damages.

The Bank argues that appellants’ first contention is barred by their failure to plead the notice provision as an affirmative defense. Furthermore, the Bank promptly notified appellants by letter of its intent to seek redress as soon as it discovered the dangerous condition. Second, the Bank notified appellants of the defects as soon as it ascertained the extent of the damage. Appellants had ample opportunity to investigate, and in fact sent representatives to the site while repairs were underway. The contract notice provision relates exclusively to defects discovered within one year of the contract’s completion. Finally, the Bank contends that it proved that it was damaged by the premature failure of the materials used.

From our review of the record and the District Court’s extensive memorandum opinion, we conclude that appellants’ claims are without merit. The court found that the Bank notified Cann and BEC by letter in October, 1977 that it intended to seek *417 redress for the south wall repairs. Whether proper notice was given is a question of fact. The letter stated that: “present indications, however, cause the Bank to believe that removal of the granite sections will show that the means by which the sections were fixed to the building was modified in the field from the manner provided in the plans and specifications for their installation.”

In our view, this language is a clear expression of the Bank’s belief that Cann and BEC breached their contract in some manner. The letter closed with the following language, which is clearly an expression of the Bank’s intention to sue: “At such time as the cause of the shifting of the granite sections has been determined, First National Bank intends to seek redress from those parties responsible ...” Read together, these excerpts are sufficient notice to satisfy the condition precedent to maintain a suit for breach of contract.

In our view, Standard Alliance Ind. v. Black Clawson Co., 587 F.2d 813 (6th Cir. 1978), cert. denied, 414 U.S. 923 , 99 S.Ct. 2032 , 60 L.Ed.2d 396 (1979), a case relied on by appellants, is readily distinguishable. That case involved the notice requirements of section 2-607(3)(a) of the Uniform Commercial Code, which provides that: “The buyer must within a reasonable time after he discovers or should have discovered any breach, notify the seller of breach or be barred from any remedy.” Defendants in Standard Alliance were notified by letter that a machine they sold to plaintiffs was defective. Defendants spent a full five months on site in an effort to repair the defects. The lawsuit grew out of these repairs, which were allegedly inadequate. However, defendants were never notified that their repairs had failed until eleven months aftex’ their workmen left plaintiff’s premises.

In this case, by contrast, the letter notified Cann and BEC of the precise defects for which they were ultimately sued. The record shows that appellants had an opportunity to cure the defect and inspect the facings on the south wall, after they received the October letter. Appellants’ failure to take more vigorous steps to ascertain the problem, satisfy their customer and take all reasonable and necessary steps to protect themselves, cannot be attributed to any lack of notice.

We turn to discuss appellants’ second argument that the claims are barred because the Bank failed to give notice of the defects with reasonable promptness. The District Court construed the “reasonable promptness” clause to relate solely to defects arising and observed within one year of completion, which the contractor would be obligated to remedy. In our view, this interpretation is reasonable and we therefore reject appellants’ theory that the clause otherwise limits either a plaintiff’s remedy or ability to sue for damages at a later date.

Relying on the reasons set forth in Judge Conti’s well-reasoned and thorough memorandum, we reject appellants’ contention that the Bank failed to prove actual damages.

Accordingly, we affirm the judgment below in all respects.

1

. 503 F.Supp. 419 (N.D. Ohio 1980).

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

Cited by 17 cases

View all citing references →
1984: 11985: 11986: 11990: 31993: 12002: 22003: 22011: 52015: 119842026peak 2011 · 5

Relies on it most ⓘ

  1. Black + Vernooy Architects v. Smith346 S.W.3d 877 (Tex. App.—Austin 2011)
  2. Stuart Thomas Gerstacker v. Kimberly Ann GerstackerNo. 03-10-00028-CV (Tex. App.—Austin Aug. 5, 2011)
  3. Black + Vernooy Architects, J. Sinclair Black, and D. Andrew Vernooy v. Lou Ann Smith Jimmy Jackson Smith, Individually and as Next Friend of Rachel and Grayson Smith And Karen E. GraveleyNo. 03-09-00518-CV (Tex. App.—Austin Aug. 5, 2011)
  4. Stuart Thomas Gerstacker v. Kimberly Ann GerstackerNo. 03-10-00028-CV (Tex. App.—Austin Aug. 5, 2011)
  5. Cincinnati Gas & Electric Co. v. General Electric Co.656 F. Supp. 49 (S.D. Ohio 1986)
  6. Information Leasing Corp. v. Chambers789 N.E.2d 1155 (Ohio Ct. App. 2003)

Most recent

  1. Diathegen, LLC v. Phyton Biotech, Inc., Phyton Biotech, LLC, Phyton Biotech, GmbHNo. 04-14-00267-CV (Tex. App.—San Antonio Aug. 26, 2015)
  2. Black + Vernooy Architects v. Smith346 S.W.3d 877 (Tex. App.—Austin 2011)
  3. Stuart Thomas Gerstacker v. Kimberly Ann GerstackerNo. 03-10-00028-CV (Tex. App.—Austin Aug. 5, 2011)
  4. Stuart Thomas Gerstacker v. Kimberly Ann GerstackerNo. 03-10-00028-CV (Tex. App.—Austin Aug. 5, 2011)
  5. Black + Vernooy Architects, J. Sinclair Black, and D. Andrew Vernooy v. Lou Ann Smith Jimmy Jackson Smith, Individually and as Next Friend of Rachel and Grayson Smith And Karen E. GraveleyNo. 03-09-00518-CV (Tex. App.—Austin Aug. 5, 2011)
  6. Black + Vernooy Architects, J. Sinclair Black, and D. Andrew Vernooy v. Lou Ann Smith Jimmy Jackson Smith, Individually and as Next Friend of Rachel and Grayson Smith And Karen E. GraveleyNo. 03-09-00518-CV (Tex. App.—Austin Aug. 5, 2011)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 2

DepthCaseCited by
Taylor v. Nashville Banner Publ'g Co., 441 U.S. 923 (1979) 156
First Nat. Bank of Akron v. Cann, 503 F. Supp. 419 (N.D. Ohio 1980) 29

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list