Baker v. Fessenden

Simon W. Baker v. Daniel W. Fessenden, Administrator on the estate of Annie R. Mitchell

Baker v. Fessenden, 71 Me. 292 (1880)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Supreme Judicial Court of Maine · State Highest Courts
Decided
July 3, 1880
Judges
Appeetqn, Con, Curred, Daneorth, Peters, Symonds, Wabton
Citations
71 Me. 2921880 Me. LEXIS 81
Headnotes
JS. S., o. 91, % 27. Lien for alterations and repairs. R. S., c. 91, § 27, will not give a lien on a mill for labor in altering and repairing tbe machinery therein, unless it is affirmatively shown, that such machinery is of that .character that makes it a part of the realty. Where a laborer has so intermingled his lien claim with non lien items, that the exact amount for which he is entitled to a lien, cannot be ascertained, the whole lien must fail. i One single lien cannot cover several distinct alterations, made at different times, and independent of each other, so as to entitle the claimant to a lien judgment for the whole, if the action is seasonably brought, after the work has ceased on the last alteration. The action must be brought within ninety days after the labor on an alteration is finished, to give a lien for that alteration, and it must be affirmatively shown that the labor performed within such ninety days, was such as was entitled to be included in the lien.
Summary
On report from tbe superior court, Kennebec county. Tbe facts sufficiently appear in tbe opinion.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Daneorth

Text extracted by OCR from a scanned original; check the original for exact wording.

Daneorth, J.

It. S., c. 91, § 27, gives to a person fumisbing-labor in erecting, altering, or repairing a building, or appurtenances, a lien upon sucb building, and on tbe lot on which it stands when both are owned by tbe debtor. Sucb is the lien claimed .and alleged in tbe declaration in this case. Hence to sustain it, the plaintiff must show that bis labor, or some definite and distinct part of it, was furnished in erecting, altering, or repairing tbe .building itself, or appurtenances; that is, that it was done on .some portion of tbe realty.

By tbe legal appropriation of the credits in tbe plaintiff’s ■account, it will appear that all tbe work furnished in erecting the building proper has been paid for, and tbe case shows that tbe portion not paid for, and for which a lien is claimed, was furnished in pursuance of a contract to work by tbe day in superintending ■the machinery generally, repairing and altering it when necessary, and in making and putting in sucb new machinery as might be *293 needed to replace the old, or as the exigencies of a change in the business might require.

lienee in order to sustain the plaintiff’s allegation of lien, it must affirmatively appear that this machinery for which the labor was furnished, was so connected with and attached to the building, so adapted to and necessary for the use for which it was erected, as to lead to the conclusion that it was intended to be permanently a part of it, and in this action a part of the realty. The case utterly fails to show this. It may be true that the evidence may satisfactorily show that a part of it, such as the lathes, shafting and saw benches, belonged to the real estate. This it appears was permanently attached to the building. But in regard to much the larger portion of it the preponderance ot the evidence leads to a different conclusion. For it appears that its "permanency was contingent on the varying circumstances of business, subject to its fluctuating condition, and liable to be taken in or out, as exigencies might require.” Pope v. Jackson, 65 Maine, 162-166.

The case shows several changes in the business done in the Building with corresponding changes in the machinery, and that a material portion of the plaintiff’s labor was expended in making such changes, sometimes in making and putting in new, and sometimes in such alterations of the old as might be necessary to adapt it to the new uses required. Another portion of his labor seems to have been furnished in simply superintending the machinery, keeping it in proper order by increasing or diminishing its speed, or in other respects, so that it should properly perform the service required.

Thus if the plaintiff might legally have had a lien for a portion of his labor, he has so intermixed and interwoven it with that for which he has shown none that it is utterly impossible for the court and probably for the parties to make any such distinction between the two kinds as to authorize a lien judgment for any definite amount.

Another and an insuperable objection to a judgment for •enforcing the lien, is the lapse of time.

R. S., c. 91, § 31, requires a suit to enforce the lien to be commenced within ninety days after the last labor is performed. *294 This of course refers to the last labor on the particular work for which the lien is claimed.

It is conceded that for some of the work charged no lien existed, and it is claimed that a deduction was made on that account. The evidence shows the number of days deducted, but fails to show which days and so leaves it uncertain whether the labor within the ninety days was under a lien or otherwise.

But further the case shows that if the plaintiff had any lien it was for alterations and repairs. The work furnished was not alone for one alteration, or for one definite repair, but for numerous distinct and separate repairs and alterations. The lien given is definite and for a particular work, which may indeed be of long continuance, but cannot be distinct jobs. One single' lien cannot cover several distinct alterations in the same building made at different times and independent of 'each other. The plaintiff therefore had not' one continuous lien, but if any, a series of liens, following, as the different repairs or alterations followed each other. The ninety days, then, in which to begin the action must commence to run when the finishing work it put upon each. The fact that a person has a second repair to make and expends labor upon it, cannot revive a first or suspend the running of the time in which he must enforce the prior lien.

Thus the plaintiff’s liens, if any existed, had all been dissolved except, perhaps, for the last work done, and in the variety of services performed by him, as already seen, it does not appear that he had any for that.

We do not decide that a series of liens upon the same building may not be enforced in one suit, but simply that labor done under .a later one will not be considered as the last, or any work done ,-under a former.

The amount claimed as due in this case appears to be sustained ,by the evidence.

Judgment against the estate for ‡624.66, and interest from date of writ. Judgment under lien claim denied.

Appeetqn, H X, Wabton, Peters and Symonds, JJ., con•curred.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

Cited by 12 cases

View all citing references →
1897: 11901: 11903: 11905: 11914: 11943: 11948: 11951: 11979: 11994: 12011: 12012: 118972026peak 1897 · 1

Relies on it most ⓘ

  1. Fischbach & Moore, Inc. v. Presteel Corp.398 A.2d 397 (Me. 1979)
  2. Thayer Corp. v. Maine School Administrative District 612012 ME 37, 38 A.3d 1263
  3. Marshall v. Mathieu57 A.2d 400 (Me. 1948)
  4. Thayer Corp. v. Int'l Wood FuelsNo. CUMre-10-565 (Me. Super. Ct June 9, 2011)
  5. Evans Marble Co. v. International Trust Co.60 A. 667 (Md. 1905)
  6. Rinzel v. Stumpf93 N.W. 36 (Wis. 1903)

Most recent

  1. Thayer Corp. v. Maine School Administrative District 612012 ME 37, 38 A.3d 1263
  2. Thayer Corp. v. Int'l Wood FuelsNo. CUMre-10-565 (Me. Super. Ct June 9, 2011)
  3. Nickerson v. Rowe647 A.2d 1191 (Me. 1994)
  4. Fischbach & Moore, Inc. v. Presteel Corp.398 A.2d 397 (Me. 1979)
  5. Morin v. H. W. Maxim Co.82 A.2d 789 (Me. 1951)
  6. Marshall v. Mathieu57 A.2d 400 (Me. 1948)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 0

No citations to other opinions in this database were found.

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list