TaiLexi AI U.S. Case Law

Rittenhouse v. Mayor of Baltimore

George R. Rittenhouse v. The Mayor & City Council of Baltimore

Rittenhouse v. Mayor of Baltimore, 25 Md. 336 (1866)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Court of Appeals of Maryland · State Highest Courts
Decided
July 11, 1866
Judges
Bartol, Goldsborough, Weisel
Citations
25 Md. 3361866 Md. LEXIS 60
Headnotes
The Rights, Powers, And Liabilities of Municipal Corporations, in respect to contracts made by them, must be considered with reference to the subject matter to which such contracts relate, and the character in which the municipal body acts in making them. Where the Corporation appears in the character of a mere property holder, and enters into a contract with reference to such property, as any private citizen or other proprietor might do; or where it engages in an enterprise not necessarily connected with, or growing out of, its xiublic capacity as a part of the local government, then all its rights and liabilities are to be measured and determined by the same rules that govern individuals or private corporations, and it cannot claim exemption or immunity from the legal liabilities growing out of the contracts by reason of its public municipal character. But in respect to contracts made by them in the exercise of powers entrusted to them in their municipal character, exclusively for xiublic purposes, Courts have no power to review or control their acts, unless they transcend the limits of their delegated powers. An ordinance of the Mayor & C. O. of Balto., axiproved April 28th, 1860, provided for the purchase of a site and the erection of a new alms-house. In virtue of the ordinance, contracts were made for the erection of the buildings, and among others the contract with R. to execute “all the brick-mason’s work, including all the bricks, lime, sand and labor in the three buildings forming the west front of the alms-house buildings,” as described in a contract dated the 9th of November, 1800. About one year after-wards, and after the commencement of the buildings and some work done by the contractors, including R., the site was discovered to be unhealthy, and the ordinance was repealed by an ordinance approved April the 5th, 18G1, which directed the committee on the alms-house to settle with the contractors, as far as it could be done, upon fair and equitable terms. Tire committee failed to agree on a settlement with R., who sued the Mayor & City Council for a breach of contract. — Herd : 1st. That the subject matter of the ordinance of I860, under which, the contract sued on was made, was one over which the appellee possessed jurisdiction and power to legislate, and that consequently the repealing ordinance of 1801 was valid, as passed in the exercise of the powers belonging to the corporationm its public, political or municipal character. 2nd. That the contract must be taken and construed as being made subject to the power of the corporation to repeal the ordinance of 1860, and to abandon or discontinue the work if, in their judgment, the public good so required, and the corporation having repealed that ordinance and abandoned the work, it. was not entitled to damages on account of profits he might have realized if he had been permitted to go on with the work. 3rd. That the evidence offered for the purpose of supporting the claim for such’prospective profits was, therefore, properly rejected. 4th. That the evidence offered with regard to damages claimed as indemnity against any loss to which R. may become liable by reason of Ms subsidiary contracts being vague and indefinite, and there being no proof offered of any damage actually incurred by reason thereof, such offered evidence was properly rejected. 5th. That any damage which R. had actually sustained by reason of the contract while the same was operative and in force, was properly recoverable in this action. There was proof offered that R. had been for fifteen years engaged in the manufacture of bricks near the city of Baltimore, and that at the date of the contract, he had on hand 600,000 bricks of his own manufacture, which were of ready sale in the market, but which lie retained in hand in consequence of the contraed, and to enable him to supply bricks necessary for the work; that after the repealing ordinance had been passed, and he received notice thereof, lie sold the bricks at prices averaging about one dollar and fifty cents per thousand less than he could have realized by a sale of them in November, 1800. - Herd : 1st. That iüié loss and damage thus incurred, if found by the jury, would be properly recoverable in this action. 2nd. That an instruction given, that R, was limited to the recovery of “any damage which lie had actually sustained by reason of the contract, and before (he enactment of the repealing ordinance? being calculated to mislead the jury as to this item oí damages, and the verdict and judgment having been against him, on an appeal by E. the judgment will be reversed and procedendo awarded.
Summary
Appeal from the Superior Court of Baltimore city: This was an action brought by the appellant against the appellee to recover damages “for a breach and violation by the defendant of its contract and agreement with the plaintiff/’’ whereby'the latter agreed “to execute and perform all the brick-mason’s work, including all the bricks, lime, sand and labor for and on the buildings forming the west front of the alms-house buildings, as described in said contract,” and whereby the defendant agreed to pay the plaintiff for such services and materials the sum of $57,350.84. The defendant pleaded performance, and on said plea'issue-was joined. The plaintiff afterwards filed a bill of particulars, for which see the opinion of this Court. Excepüon. — At the trial of the cause the plaintiff, to sustain the issue joined on his part, read in evidence to the jury the ordinance- of the Mayor and City Council of Baltimore entitled', an ordinance providing for the purchase of a site and the- erection of an- alms-house and the necessary outbuildings, &e., approved April the 28th,■ 1860; and also read in evidence the contract or articles of agreement between himself and the defendant. He-further proved that in the-month of November, in the year I860, he entered into a contract with the said- defendant' through- its proper agent to execute and perform all the brick-mason’s work, including the supply of all the bricks, lime, sand' and lime for the same, for and on the three buildings;, forming the west front of the said alms-house building. according to the plans, elevations, sections and working drawings and specifications provided for the purpose — for all which work and materials the said defendant contracted- to pay him the sum of $57,350.84; and, also, read in evidence, the bond which he had givep to the defendant for the performance of the contract on Ms part. He then read in evidence to the jury Ms proposals to the defendant, from which it appears that the contract aforesaid was at the rate of $10.93 per thousand of bricks, to be supplied by him as aforesaid, the quantity of brick being 53,000, also the plans, specifications, &c., which it is agreed are to b.e inserted in this bill of exceptions, or appended to it if it shall be so required by either party. The plaintiff* being then sworn as a witness for himself, proved that in consequence of his aforesaid contract -with the said defendant and to enable him the more conveniently to execute his part thereof, and shortly after making said contract ho entered into an agreement with one Daniel White, the owner of a lot of ground in the vicinity of the site of the alms-house, for the privilege of digging the clay on said lot for manufacturing thereof the bricks intended by Mm for said alms-house, and for making and burning the said bricks on the said lot, and for taking wood from said lot for burning the said bricks, and did actually dig a quantity of clay on said lot, and made a small quantity of bricks thereof at the plaintiff’s yard on West Baltimore street; this was done to determine the quality of said clay, and of the bricks made therefrom, and that the bricks so made were of a good merchantable quality, and fully equal in quality to the specifications aforesaid; that he was to pay to the said White, for the privileges aforesaid, the sum of fifty cents for every thousand bricks he should make as aforesaid, and also an additional sum for the wood to be used as aforesaid ; that he has paid said White nothing on the said'contract with him; but said White claims damages or compensation from him for the non-performance of his said contract with the said White; that said lot was in the possession of a tenant, and he knows said White was put to trouble and to some expense in getting rid of said tenant for the purpose of giving possession thereof to the plaintiff for the purpose aforesaid; and he further proved, that shortly after his contract with the defendant as aforesaid, he entered into a sub-contract with one Emanuel Irons, a competent and responsible brick-mason, for supplying the said lime and labor, and laying the bricks to be supplied by the plaintiff as aforesaid ; and that the price to be paid by the plaintiff to the said Irons for materials and labor to be furnished by him was at the rate of three dollars and fifty-eight cents.per thousand of bricks to belaid by him; that he, the plaintiff, has paid nothing to the said Irons on the said contract; but the said Rons claims damages or compensation for the non-performance of his said contract with the said Irons; and he knows that said Irons, in part execution of said contract, hauled to the said site one hundred and fifty loads of sand, and dug out of the bank some seven hundred other loads of sand for the purpose of hauling the same to the said site. The plaintiff then read in evidence the ordinance of the defendant approved April the 5th, 1861. And also read the following letter from George Wm. Drown, at the time mayor of the city of Baltimore: “Mayor’s Office, “Baltimore, April 8th, 186f.¿ 8ir: — I hereby give you notice that an ordinance has been passed, by the Mayor & City Council of Baltimore, directing that the building designed for an alms-house, heretofore commenced on the farm purchased of A. W. Goldsborough, be discontinued and stoiiped. “Respectfully, “Geo. Wm. Brown, Mayor. ilTo L. B. Jiittenhousc And further to sustain the issue on his part, and to prove his ability and readiness to perform his aforesaid contract with the defendant, lie proved that for the last fifteen years he has been engaged in the manufacture of bricks in and near the city of Baltimore, and that at the date of his contract with the said defendant he had machinery and also stock of boards and utensils in quantity to enable him to execute his said contract, and that he had on hand six hundred thousand bricks of his own manufacture, which were of ready sale in the market, but which he retained in hand in consequence of said contract, and to enable him to supply any demand which the defendant might make on him for bricks before be could commence making bricks on the lot of said White; and that after, the repealing ordinance had been passed and notice thereof given to him as aforesaid, he sold said bricks at prices averaging about one dollar and fifty cents per thousand less than he could have realized by a sale of them in November, 1860. And, thereupon, the plaintiff, further to support his claim for damages on the third item of his bill of particulars, asked the said witness, Hittmhouse, what would have been the cost to him of manufacturing bricks of the quality required for the fulfilment of his aforesaid contract with the defendant on the said lot of the said White in the year 1860, and what would have been the cost of hauling said bricks from the said lot to tbe site of the alms-house building aforesaid? But the said defendant objected to said question, and tbe evidence offered on the part of the said plaintiff being so offered and admitted, subject to exception the said defendant further prayed the Court to exclude all such parts of said evidence as related to the said contracts between the said plaintiff and the said White and the said Irons, and as relates to damages claimed by the said plaintiff by reason of the repeal of the ordinance first aforesaid, offered in evidence, and of the refusal of the defendant to permit the plaintiff to proceed in the execution of his contract with the defendant as aforesaid, after the passing of the said repealing ordinance. Whereupon, the Court, on said objection and prayer of the defendant as aforesaid, refused to permit the said question to be put to the witness, and withdrew from the consideration of the jury all said parts of the evidence -so given to the jury, and now excepted to by the defendant as aforesaid, — being of opinion, and so declaring, that the said -repealing ordinance was passed by the said defendant in .exercise of its legislative power, and that the said repeal .determined its obligation to proceed further in the execution of the contract made between them and the said plaintiff, so entered into under the provisions of the ordinance first aforesaid, and that although the said plaintiff might recover on the said first item of claim in the bill of particulars any damage which he had actually sustained by reason of the contract so entered into between him and the said defendant, and before the enactment of the said repealing ordinances, and whilst said contract was in force, were not entitled to claim in this action any damage as indemnity against any loss to which he may have become liable to the said White and the said Irons, by reason of his said subsidiary contracts with them, -and there is no evidence of damage actually incurred by him by reason thereof, and that the said plaintiff is not entitled to recover any probable profits which he might have realized if he had been permitted to execute his contract with the defendant, made as aforesaid. To which said opinion of the Court, and to the exclusion of evidence as aforesaid, and the refusal of the Court to permit the aforesaid question to be answered, the plaintiff excepted, and the verdict and judgment being for the defendant, brought this appeal.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Bartol

Text extracted by OCR from a scanned original; check the original for exact wording.

Bartol, J.,

delivered the opinion of this Court.

The bill of exceptions in this case presents the question of the liability of the appellee, upon a contract made with the appellant, for brick-mason’s work and materials to be done and furnished in the erection of an alms-house. The contract ivas made under an ordinance of the city, approved April 28th, 1860, which provided for the purchase of a site and the erection of a new alms-house.

After the buildings had been commenced and some work done by the contractors, an ordinance ivas passed and approved on the 5th of April, 1861, reciting that a farm had been purchased from A. W. Goldsboro ugh for the site of anew *346 alms-house-, which is now ascertained not to he suitable or adapted for the purpose, because it is unhealthy; and declaring that the public good required the building to he discontinued, and the site to he abandoned, and another more suitable to be selected. It repealed the ordinance of 1860, and directed the committee having charge of the work to settle with the contractors, as far as it could be done, uj>on fair and equitable terms.

No settlement having been made with the appellant, he brought this action to recover damages for a breach of the contract made with him by the appellee. By the hill of particulars filed he claimed:

1st. His actual outlays in the preliminary steps for executing the contract, $500.00.

2nd. An indemnity against his liabilities towards those with whom he had contracted, to enable him to fulfil his contract with the city, $7,500.00.

3rd. Damages equivalent to the profits which he would have realized on said contract with the city if he had been permitted to execute the same, $20,000.00.

In considering the rights, powers and liabilities of public municipal corporations, in respect to contracts made by them, regard must he had to the subject matter to which such contracts relate, and the character in which the municipal body acts in making them. "Where the corporation appears in the character of a mere property holder, and enters into a contract with reference to such property as any private citizen or other proprietor might do; or where it engages in an-enterprise, not necessarily connected with or growing out of its public capacity, as a part of the local government; there-all its rights and liabilities are-to he measured and determined by the same rules as govern mere individual persons, or private corporations; and it cannot claim exemption or immunity from the legal liabilities growing out of its contracts- *347 by reason of its public municipal character. The cases of Bailey vs. The Mayor, &c., of New York, 3 Hill, 531 . Masterton vs. The Mayor, &c., of Brooklyn, 7 Hill, 61 , and The Western Saving Fund Society vs. The City of Phila., 31 Pa., (7 Casey,) 175 & 185, are illustrations of this principle. See, also, Moodalay vs. The East India Company, 1 Brown's Ch. R., 469.

The same cases recognize a distinction between the rights and liabilities of municipal corporations growing out of contracts made by them, in their private capacity, as property holders, and those which arise out of the exercise of powers entrusted to them in their municipal character exclusively for public purposes, with regard, to which Courts have no power to review or control their acts, unless they transcend the limits of their delegated powers.

In the case of The Presbyterian Church vs. The Mayor, &c., of New York, 5 Cowen, 538, which was an action by the church against the city upon a covenant for quiet enjoyment, the corporation had conveyed lands to the plaintiff for the purpose of a church and cemetery, with a covenant for quiet enjoyment; afterwards the corporation, in the exercise of a pow'er delegated to it by an Act of the Legislature, passed a by-law prohibiting the use of the lands as a cemetery. It was held that this was not a breach of the covenant which entitled the plaintiff to damages, but was a repeal of the covenant. It was held that a municipal corporation cannot, by contract, abridge its legislative power. The ground of the decision was, that while the liability of “the defendants upon the covenant was the same as if it had been entered into by an individual, the effect of the by-law upon it was the same as if this had been an Act of the State Legislature.” The rule as stated in 3 Salk., 193, was applied, viz: “If H. covenants to do a thing which is lawful, and an Act of Parliament comes in and hinders him from doing it, the covenant is repealed.” And though the corporation had enter *348 ed into the covenant, it was not, for that reason, prevented from passing the by-law or estopped from relying upon it in defence; because in passing the by-law it acted in its public legislative capacity, in which its powers could not be abridged by any previous covenant into which it had entered.

The principles of that decision were afterwards re-affirmed, by the same Court, in Coates vs. The Mayor, &c., of N. Y., 7 Cowen, 585, and have been recognized and approved by this Court in State, relation of McClellan, vs. Graves, 19 Md. Rep., 351 .

Applying these principles to the case before us, we have been led to the following conclusions;

1st. That the subject matter of the erdinance of 1860, under which the contract sued on was made, was one over which the appellee possessed jurisdiction and power to legis.late, and that consequently the repealing ordinance of 1861 was valid as passed in the exercise of the powers belonging ■to the appellee in its public, political or municipal character.

2nd. That -the contract must be taken and construed as being made subject to the power of the corporation to repeal the ordinance of 1860, and to abandon or discontinue the work if, in their judgment, the public good so required, and consequently the appellant is not entitled to claim any damages on account of profits he might have realized under the contract if he had been permitted to go on with the work; and the evidence offered at the trial, for the purpose of supporting the third item of damage in the bill of particulars, vas properly rejected by the Court below.

We a.re also of opinion that there was no error in rejecting the evidence with regard to damages claimed in the second item of ,the bill of particulars -as indemnity against any loss to which the appellant may have become liable by reason of his subsidiary contracts with White and Irons, for the reason that the evidence on that subject is vague and indefinite, *349 and there was no proof offered of any damage actually incurred by reason thereof.

We concur, also, generally in the views expressed by the judge of the Superior Court as to the right of the appellant to recover under, the first item of claim in the bill of particulars, any damage which lie had actually sustained by reason of the contract, while the same was operative and in force.

There was proof offered that the appellant had been, for fifteen years, engaged in the manufacture of bricks near the city of Baltimore, and that at the date of the contract he had on hand 600,000 bricks of his owp manufacture, which were of ready sale in the market, but which he retained in hand in consequence of the contract, and to enable him to supply bricks necessary for the work. That after the repealing ordinance had been passed, and he received notice thereof, he sold the bricks at prices averaging about one dollar and fifty cents per thousand less than he could have realized by a sale of them in November, 1880.

Unquestionably, that item of loss and damage, if found by the jury, would be properly recoverable in this action. And some parts of the instruction of the Court below are susceptible of a construction which would allow the appellant to recover in respect to this item. The instruction does not seem to have been so construed by the appellant’s counsel; and there is one expression in the Court’s instruction that might mislead the jury in regard to this item of claim; — the appellant was limited to recover “any damage which he had actually sustained by reason of the contract, and before the enactment of the repealing ordinance.” With regard to the damage resulting from the loss in the sale of the bricks, it might be said that it had not been actually sustained till they were sold, which was after tbe repealing ordinance had been passed, and thus, under the instruction, the jury may haye considered it as excluded. Copsideririg that this dam *350 age, ü found by the jury, was one actually suffered under the contract while it was in force, although the amount of it was not ascertained till afterwards, and ought to be allowed, and believing the jury may have been misled by the language of the Court, we think there ought to be a new trial, and will, therefore, reverse the judgment and award a writ of procedendo.

(Decided July 11th, 1866.)

Judgment reversed, amd procedendo awarded.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

Cited by 20 cases

View all citing references →
1879–1880: 21893–1894: 21895–1896: 11899–1900: 21901–1902: 11905–1906: 11909–1910: 11927–1928: 21933–1934: 11935–1936: 11975–1976: 11977–1978: 11985–1986: 11997–1998: 12013–2014: 218792026peak 1879 · 2

Relies on it most ⓘ

  1. Harford County v. Town of Bel Air704 A.2d 421 (Md. 1998)
  2. Callaway v. Mayor of Baltimore2 Balt. C. Rep. 352 (1905)
  3. Leese v. Baltimore County497 A.2d 159 (Md. Ct. Spec. App. 1985)
  4. City of Indianapolis v. Indianapolis Gas-Light & Coke Co.66 Ind. 396 (1879)
  5. Robert T. Foley Co. v. Washington Suburban Sanitary Commission389 A.2d 350 (Md. 1978)
  6. American Structures, Inc. v. Mayor of Baltimore364 A.2d 55 (Md. 1976)

Most recent

  1. In re Steven D. MolaskyNo. NV-14-1109-PaJuHl (9th Cir. BAP Oct. 20, 2014)
  2. In re Steven D. MolaskyNo. NV-14-1109-PaJuHl (9th Cir. BAP Oct. 20, 2014)
  3. Harford County v. Town of Bel Air704 A.2d 421 (Md. 1998)
  4. Leese v. Baltimore County497 A.2d 159 (Md. Ct. Spec. App. 1985)
  5. Robert T. Foley Co. v. Washington Suburban Sanitary Commission389 A.2d 350 (Md. 1978)
  6. American Structures, Inc. v. Mayor of Baltimore364 A.2d 55 (Md. 1976)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 1

DepthCaseCited by
State ex rel. McClellan v. Graves, 19 Md. 351 (1863) 49

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list