TaiLexi AI U.S. Case Law

Baltimore & Potomac Railroad v. Magruder

The Baltimore and Potomac Railroad Company v. Fielder Magruder

Baltimore & Potomac R.R. v. Magruder, 34 Md. 79 (1871)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Court of Appeals of Maryland · State Highest Courts
Decided
February 15, 1871
Judges
Miller
Citations
34 Md. 791871 Md. LEXIS 101
Headnotes
jEight of a Bailroad Company to divert a Stream of water flowing across the Line of its road — How the Bight to divert such stream may be acquired — Admissibility of Evidence de hors the Inquisition to show that the Attention of the Jury of Inquest was directed to the proposed Diversion — Invalidity of a Claim for damages by the Owner of the Land through which the stream flows, for Injury occasioned by its diversion. Under a charter conferring- on a Railroad company the power to acquire by condemnation, land for the construction of its road, the company have the right to divert, if they see fit to do so, a stream of water flowing across the line of their road. The right thus to divert a stream of water, does not depend upon an express grant to be made and specified in the inquisition itself, hut may be acquired by condemnation of the land, duly confirmed, and payment or tender of the damages awarded ; and proof de hors the inquisition is admissible to show that at the time of taking and before they signed the same, the attention of the jury of inquest was directed to the intended diversion. And where the attention of the jury is directed to such diversion, and the same is within the lines of the land condemned for the construction of the road, the owner of the land through which the road passes, has no remedy, either at law or in equity, for any injury that may result therefrom.
Summary
Appeal from the Circuit Court for Prince George’s County, in Equity. The bill in this case, filed on the 19th of March, 1869, by the appellee, alleged that he was the owner of a large tract of land in Rrince George’s County; that the appellant had located the route of its road through said land, and was engaged in constructing it; that in constructing the road, the appellant claimed to have the right to alter and change the bed and course of the “ Beaver Dam,” a stream which had run, from time immemorial, through the complainant’s land, and was the only branch on which he depended for watering his stock, and which supplied an ancient mill-race, then owned by him, and which he was about to repair in order to carry on his mill. The bill also alleged that the appellant had commenced to dig and cut a canal for the purpose of diverting the water from the bed of the said stream; and was about to cut through and entirely fill up the bed of the said mill-race which crossed the railroad at a certain point, without providing a bridge or culvert for the escape of the water, Ac., and would thereby destroy the mill-race and mill. The bill further alleged that the diversion of the stream and the filling up of the mill-race would leave the lands of the complainant without the necessary supply of water, would destroy the value of his mill and mill-race, and that the damage would be irreparable. The bill denied the right of the Railroad company to divert the course of the Beaver Dam stream,- or to fill up any portion of the mill-race, and charged that it was the duty of the company to build bridges, culverts, Ac., for the uninterrupted passage of all streams which crossed the line of their road. The bill concluded with a prayer for an injunction commanding the company, &c., to cease from diverting or altering the water of the “ Beaver Dam ” branch from its present bed or course through the complainant’s lands, and also to desist from any attempt to shut up or destroy the mill-race running through his land at the point where the said mill-race crossed or intersected the line of the railroad. Upon this bill the Court granted an injunction. On the 28th day of April, 1869, the Baltimore and Potomac Railroad Company filed their answer, admitting that they were engaged in constructing their road through the land of the complainant, and averred that being unable to agree with him for the purchase, or use, or occupation of the land wanted for the construction of their road and the works of the same, they caused a warrant to be issued; that under this warrant the jury valued and condemned certain real estate and assessed the damages which the complainant would sustain by the use and occupation aforesaid, at §5,225; that the inquisition was confirmed, and the damages had been paid to the complainant. The defendants further admitted that in the construction and building of the road, they had changed the “Beaver Dam” stream or straightened the same, but they averred that in making the change they had not carried the stream outside of the limits of the land condemned, and that the proposed change was necessary for the proper construction of the road, and that under their charter and the said inquisition they had the right to make such change. The answer denied that the proposed change would deprive the complainant of water for the use of his stock; and further that there w'as a mill-seat and mill-race to which the complainant could set up any claim, and that in point of fact they were depriving the complainant of the use of a race or mill-seat by so changing the course of the stream. The defendant further charged that the sum of §5,200 awarded as damages, covered all damages which the eomplainant would sustain by the construction of the .road and works thereof; that by the reception of the damages he was estopped from claiming that the straightening of the stream in the proper and necessaiy construction of the road was an irreparable damage; and further that he had been compensated for whatever damage might be sustained by the construction of the road in a proper and necessary manner. A motion was made after filing the answer to dissolve the injunction. And upon the petition of the complainant, an order was passed to take testimony to be used at the hearing of the motion. A large amount of testimony was taken. The case was submitted for final hearing upon the bill, answer, and proof taken under the motion to dissolve the injunction. On the 2d of August, 1869, the Court (Magrtjder, J.,) passed an order overruling the motion to dissolve the injunction, and making the injunction perpetual. * From this order the present appeal was taken.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Miller

Text extracted by OCR from a scanned original; check the original for exact wording.

Miller, J.,

delivered the opinion of the Court.

Since the passage of the decree from which this appeal is taken, the ease of Beaver vs. The Western Maryland Railroad Company has been decided by this Court. That was a case where Beaver brought an action of trespass quare clausum fregit, against the Railroad Company for entering upon his land, and by. the construction of their road, diverting a stream of water called the ^Patapsco Falls” from its ancient course into a new channel, dug for that purpose, whereby the stream was cut off from a large part of his farm through which it used to flow, so that he could no longer water his stock and cattle therefrom, and us’e it for the purposes of his farm as he had been accustomed to do. The company relied upon the inquisition (which had been duly confirmed and the assessed damages paid) and the fact that the attention of the jury of inquest was directed to the intended diversion of the stream, and that the same was within the lines of the land condemned, as a bar to any recovery for damages resulting from such diversion: The inquisition there does not materially differ from that in the present case. Instead of describing *87 the land condemned precisely in the same mode as the one before us, it did so chiefly by reference to lines on a plat filed with, and made part of the inquisition, “ which lines,” as it states, “ fully describe the piece or parcel of land required by the said Western Maryland Railroad Company” for the construction thereon of the bed of their road, but in both it is the described land that is condemned, and there is nothing on the face of either amounting to an express grant of the right to divert the stream. In that case, conflicting oral testimony of many witnesses on both sides was offered upon the question whether the attention of the jury of inquest, was called to the intended diversion, as well as whether they actually took it into consideration in estimating the damages they awarded. At the instance of the defendant the Court below instructed the jury that if they should find from the evidence, that the attention of the jurors who found the inquisition was called to the intended diversion of the stream in the construction of the railroad, and should also find that the road was constructed, and the new channel for the diversion of the stream was dug, in and upon the land within the lines of the land condemned by the inquisition, then their verdict must be for the defendant, and in reference to this instruction this Court said: “ Wc can discover no objection to this prayer, and the only objection that is made to it in the appellant’s brief, is that it should have required the jury to find that the jury of inquest estimated, in the damages allowed by it, the injury to the appellant by reason of the intended diversion of the water in the Patapsco Falls. The prayer did require the jury to find that the attention of the jury of inquest was directed to that diversion, and the legad presumption is that they estimated in their inquisition the damages to result from such diversion. Chesapeake and Ohio Canal Co. vs. Grove, 11 G. & J., 404 .”

That case decides first, that under a charter, similar in this respect to that of the appellant, conferring the power to acquire by condemnation land for the construction of its road, the company has the right to divert, if they see fit to do so, a *88 stream of water flowing across the line of their road: secondly, that this right does not depend upon an express grant to be made and specified in the inquisition itself, but may be acquired by condemnation of the land duly confirmed, and payment or tender of the damages awarded, and proof de hors the inquisition that the attention of the jury of inquest was directed to the intended diversion at the time of taking, and before they signed the same: and thirdly, that if the attention of the jury was thus directed to such diversion, and the same was made within the lines of the land condemned for the construction of the road, the owner of the land through which the road passes has no remedy, either at law or in equity, for any injury that may result therefrom.

(Decided 15th February, 1871.)

The inquisition in the present case was regularly confirmed, and the damages thereby awarded have been paid to the appellee. The proof in the record, which -we have examined with care, establishes to our satisfaction the fact that the attention of the jury was directed to the proposed diversion of the stream called “Beaver Dam Branch,” (the making of which the injunction restrains,) from its old channel through the lands of the complainant, at the time of taking and before they signed their inquisition, and also that such diversion is confined within the limits of the land condemned.

The decree appealed from must be reversed, the injunction dissolved and the bill of complaint dismissed.

Decree reversed and bill dismissed.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1872–1873: 11888–1889: 11890–1891: 11894–1895: 11978–1979: 118722026peak 1872 · 1

Relies on it most ⓘ

  1. Denver City Irrigation & Water Co. v. Middaugh12 Colo. 434 (1889)
  2. Eaton v. B. C. & M. R. R.51 N.H. 504 (1872)
  3. Walker v. Acting Director396 A.2d 262 (Md. 1979)
  4. Baltzell v. Baltimore Belt Railroad1 Balt. C. Rep. 187 (1891)
  5. Baltimore Belt Railroad v. Baltzell1 Balt. C. Rep. 445 (1894)

Most recent

  1. Walker v. Acting Director396 A.2d 262 (Md. 1979)
  2. Baltimore Belt Railroad v. Baltzell1 Balt. C. Rep. 445 (1894)
  3. Baltzell v. Baltimore Belt Railroad1 Balt. C. Rep. 187 (1891)
  4. Denver City Irrigation & Water Co. v. Middaugh12 Colo. 434 (1889)
  5. Eaton v. B. C. & M. R. R.51 N.H. 504 (1872)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 0

No citations to other opinions in this database were found.

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list