TaiLexi AI U.S. Case Law

Basshor v. Baltimore & Ohio Railroad

Thomas C. Basshor and Wallace Stebbins, trading as Thomas C. Basshor & Co. v. The Baltimore and Ohio Railroad Company

Basshor v. Baltimore & Ohio R.R., 3 A. 285 (Md. 1886)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Court of Appeals of Maryland · State Highest Courts
Decided
March 10, 1886
Judges
Alvey, Bryan, Irving, Ritchie, Robinson, Robtnson
Citations
3 A. 28565 Md. 991886 Md. LEXIS 12
Headnotes
Mec1tan■¡cs, Lien — Material-man—Machinery. In providing that a material-man shall have a lien for all materials furnished for, or used in and about, the construction of bridges, the law means such materials as ordinarily enter into or are used in the construction of bridges, and are fairly within the express or implied terms of the contract between the owner and contractor. It docs not mean the machinery that may be used for the manufacture of the materials themselves. Where a contractor for building a bridge, buys machinery for crushing stone to bo used in the manufacture of artificial stone for the masonry work, and also appliances to carry the manufactured stone to the place where it is to be used, the seller of such machinery and appliances has no lien therefor under the provision of the mechanics’ lien law, which gives a material-man a lien for all materials furnished for, or used in and about, the construction of bridges.
Summary
Appeal from the Circuit Court for Baltimore County. In this case the appellants claimed to have a mechanics’ lien against the bridge, abutments, &c., belonging to the appellee, built across the Big Gunpowder River in Baltimore County, on the line of the railroad of said appellee between Baltimore City and Philadelphia, for certain machinery, engines and-other materials furnished by them to the Hoopes Artificial Stone, Cement and Paint Company, the contractor for the building of the abutments and piers of said bridge, and used by said contractor in, for and about their construction. At the close of the plaintiffs’ testimony, the Court, (Fowler, J.,) at the instance of the defendant, granted the following prayer: “That the plaintiffs are not entitled to recover in this action, because they have introduced no legally sufficient evidence to show that the articles embraced in the lien claim were materials furnished, or work done, for or about the bridge over the Big Gunpowder River.” The plaintiffs excepted, and the verdict and judgment ' being against them, they appealed.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Robinson

Text extracted by OCR from a scanned original; check the original for exact wording.

Robinson, J.,

delivered the opinion of the Court.

We do not see any grounds on which the mechanics’ lien claimed in this case can be sustained. The Hoopes Artificial Stone Company contracted with the defendant corporation to build its bridges over the “Big” and “Little Gunpowder.”

The masonry work was to be built of artificial stone, and this artificial stone was to be made of finely ground stone, sand and cement. For' the purpose of grinding the stone to be used in the manufacture of the artificial stone, *103 the Hoopes Company bought certain machinery of the appellant, and it bought also appliances to carry the stone when made to the piers of the bridges where it was to he used. And it is contended that the machinery and appliances thus sold to the contractor, are materials furnished in the construction of the bridges, within the meaning of the mechanics’ lien law.

(Decided 10th March, 1886.)

This seems to us to he stretching the lien law, rather beyond anything warranted either by the letter'or the spirit of the law. When the law says, the ‘material-man shall have a lien for all materials furnished for, or used in and about, the construction of bridges, it means such materials as ordinarily enter into, or are used in the construction of bridges, and which are fairly within the express or implied terms of the contract, between the owner and contractor. It does not mean, the machinery that may he used for the manufacture of the materials themselves. You might just as well say, that the mill by which the lumber is sawed, or the tools used by the mechanic in building a house, are materials furnished in the construction of the house, as to say that the machinery used in the manufacture of the artificial stone, is to be considered as part of the materials used in the construction of the masonry work of the defendants’ bridges. The machinery thus used is the plant of the contractor, and can in no sense he said to be materials furnished or used in building the bridges.

The mechanics’ lien law is, it is true, to he liberally construed, hut Courts have no power to extend it to cases, beyond the obvious designs and plain requirements of the statute.

Judgment affirmed.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

Cited by 35 cases

View all citing references →
1890: 11900: 21903: 11904: 11905: 21907: 21908: 11909: 11910: 31911: 31912: 11914: 11915: 11916: 11919: 11922: 11924: 11925: 11929: 11930: 11934: 11935: 11939: 11962: 11965: 11969: 22002: 118902026peak 1910 · 3

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 0

No citations to other opinions in this database were found.

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list