TaiLexi AI U.S. Case Law

Creager v. School District No. Nine

Henry Creager v. School District Number Nine of the Township of Wright

Creager v. Sch. Dist. No. Nine, 28 N.W. 794 (Mich. 1886)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Michigan Supreme Court · State Highest Courts
Decided
June 24, 1886
Judges
Campbell, Champlin, Morse, Sherwood
Citations
28 N.W. 79462 Mich. 1011886 Mich. LEXIS 761
Disposition
Reversed, and judgment entered for amount of plaintiff’s claim, with interest from commencement of suit and costs of all the courts.
Headnotes
line fence around school house site — A "necessary appendage ” within the meaning of the statute— Where electors direct district board to build such a fence — And board estimates its cost, but takes no further action in the matter — And the director, without the knowledge of his co-members, lets the contract according to such specifications — And after the contractor has his material on the ground, the assessor notifies him that he had better- have an understanding ■with the district board or he may have trouble in getting his pay — But he is not forbidden to build the fence— Which he constructs according to contract— Which fence is not accepted by the board — And acceptance is refused at a speddl meeting of the electors — And the moderator refuses to countersign an order for the contract price — Which is lost, and suit brought against the district — Held, that the director had a right to let the contract in the manner stated — “ Appendages," under the school statutes, includes fuel, fences, and necessary out-houses — Duty of director to provide same not confined to school ' term — They should be on hand when school opens — It then becomes his duty to keep same in repair, as also the school-house — If mandamus was plaintiff’s appropriate remedy, defendant is estopped from raising the objection for the first time in the appellate Court. 1. Pending the erection of a school-house, the electors of the district voted to build .a line fence around the school-house site, specifying the plan and manner of its erection, and directed the district board to build the same. The board estimated the cost of the fence, but took no action with reference to letting the contract, or any steps towards its construction; and the moderator and assessor left the board meeting, with the understanding that the board would meet in the near future and let that and other jobs. Soon after this meeting, the director, assuming to act in behalf of the district, contracted for the construction of the fence, according to the specifications adopted by the electors. The other members of the district board were ignorant of this action until after the contractor had procured material and dug the post-holes, when the assessor notified him “ that he had better have an understanding with the school board, or he might not get his pay;” but he was not forbidden to build the fence, which he completed according to agreement. The school board never accepted the fence, and at a special meeting of the electors they refused to accept or pay for it. No school was being taught at the time of the making or completion of the contract. Held, that the fence was a necessary appendage to the school house, and that the director had the right to let the contract for building the same in the manner stated. H. A line fence around a school-house site falls within the same category as a well, wood-house, or privy, and is a necessary appendage to the building. While not an annexation, it ' is certainly accessory thereto. 3. The word “ appendage,” as used in our. school statutes, does not méan simply the school apparatus to be used inside of the building, nor is it limited to brooms, pails, cups, etc., but must be construed to include fuel, fences, and necessary out-houses. 4. Under How. Stat. § 5073 (subdiv. 6), .the power and duty of tha director to provide the necessary appendages for the school-house is not confined to the actual sessions of the school, as nearly all such appendages ought to be on hand when the school opens, and should be furnished or built beforehand; and it then becomes the duty of the director to keep them, with the building, in good condition and repair during the time school shall be taught therein. 5. Where a contractor received an order from the director of a school district in payment for building a school-house fence, which the moderator refused to countersign, and the order was lost, and an action of assumpsit was brought against the district and tried in justice’s and circuit courts without any objection by the defendant that mandamus was the appropriate remedy,— Held, that such claim, even though it might have been a good defense if seasonably made, will not be considered for the first time in the Supreme Court.
Summary
Error to Ottawa. (Arnold, J.) Assumpsit. Plaintiff brings error. The. facts are stated in the opinion, and in head-note 1.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Morse

Text extracted by OCR from a scanned original; check the original for exact wording.

Morse, J.

The plaintiff brought suit in justice’s court to recover the contract price for building a fence around defendant’s school site, and recovered a judgment of $30, and costs.

Upon appeal to the circuit court for Ottawa county, and trial before Hon. Dan. J. Arnold, circuit judge, without a jury,-the defendant had judgment.

■ The plaintiff brings error to this Court, and insists that the finding of facts does not support the judgment, arid asks that judgment be entered here for the plaintiff for the same amount rendered by the justice, that being the sum agreed upon in the contract hereinafter mentioned.

The'faets are substantially as follows:

A school-house was being erected upon the school site in October, 1884, to be completed in December of the same year. Ou the fourth day of October, 1884, at a special meeting of the' electors of the school district, legally held, it was voted to build a line fence around said site; the kind of fence, and the manner of its erection, being specified. It was also ordered at said meeting that the district board build or cause such fence to be built.

Soon afterwards the district board met, all being present, and estimated the cost of the fence at $32. No action.was taken, however, in reference to letting the job of building the same, or any steps taken towards building it." Besides the building of this fence,' there were other contracts to let, such as building a wood-shed and moving privies. The officers at this meeting had some talk about letting these jobs, and the moderator told the director to' negotiate with parties for doing these jobs. The assessor did not hear this, however, and both he and the moderator left the meeting, understanding that the school board would meet again in the near future to let these several contracts.

Soon after this meeting, the director, assuming to act in behalf of the district,' made an agreement with the plaintiff to build this fence according to the specifications as voted, for the sum of $30. The other members of the board did *106 not know of tbe making of this contract at the time it was= made, and never either authorized or ratified it.

After the plaintiff had procured the materials for the-fence, and placed the same upon the ground, and dug the post-holes, he was notified'by the assessor that he liad better have an understanding with the school board, or he might not get his pay.

The plaintiff completed the job in accordance with the agreement, and. the director drew an order upon the assessor for $30, and delivered it to the plaintiff. He presented it to the moderator, who refused to countersign it. The plaintiff subsequently lost the order.

Neither the. moderator nor assessor knew that the director’ intended to let the contract for building the fence until it was in progress of erection. The school board never accepted the fence as built.

The matter was brought up at a special meeting of the; district electors, who refused to accept the fence or pay for it. • No school was being taught at the time the fence was contracted for, or at the time it was completed. The schoolhouse was finished about December 10,1884. The evidence-fails to show how long after the house was completed before a school was taught therein.

The plaintiff claims that this fence is a necessary appendage to the school-house, and that, under the statute, the director had the power and authority to let the contract.

The circuit judge thought that the school board only had the power to make such a contract, and, as neither it nor the school district had accepted the fence, or ratified in any way the director’s contract, ruled that the plaintiff could not recover.

There is no dispute but the fence was built just as the district wanted it, and for a less price than the board estimated it would cost to erect it. The plaintiff was not forbidden to build it. The assessor and the moderator, and presumably most of the district, knew that he was building it, and said nothing, except the remark of the assessor that he better have an understanding with the board, or he might not get *107 his pay. This might have been taken by the plaintiff as relating simply to the price of his work. He was not informed, in any manner, by these officers, that the director had no power to make the contract, but that the board alone' could let the job or authorize the work.

It does not appear that the fence has been removed by anybody, or that the district is unwilling to enjoy the benefits of plaintiff’s money and labor invested in the fence. The defense to his claim is purely technical. There is nothing either to show that the director did not act in good faith believing he had the power, or that the assessor or moderator called his attention to his want of authority until after the work was done.

There is no-equity in the refusal of the district to pay plaintiff, nor do I think its action can be sustained by the law of the case.

It-appears that'the building of this, fence was provided for by the electors of the district, and it is not claimed that anything further was necessary to be done by the voters of the school district.

The only question is whether the officers of the district, acting -as a board, should let the contract for this work, or whether the director alone had authority, by virtue of his office, under the statute, to provide for the building of the fence.

I find no authority conferred upon the district board, by the statutes, specifically to purchase the necessary appendages or school apparatus for the school-house; nor is the subject of a fence, wood-shed, well, or privy mentioned anywhere ini the school laws. But the sixth subdivision of section 5073 of Howell’s Statutes authorizes the director “ to provide the necessary appendages for the school-house, and keep the same in good condition and repair during the time school shall be taught therein.”

Is a fence a necessary appendage for the sehool-housé under this statute ? We think the fence, at least in this case, was a necessary appendage to this school-house. It was a line fence, and therefore presumably necessary- to be built.' *108 It comes within the same category as a well, wood-house, .Or a privy, and has been held a necessary appendage in Hemme v. School District, 30 Kan. 377 . While it is not an annexation to the school-house, it can certainly be considered an accessory to it.

The word “ appendage,” as used in our. school statutes, does not mean simply the school apparatus to be used inside the building; nor do I think it can be limited to such articles as brooms, pails, cups, etc., but must be construed in a broader sense, as it has in other courts, to include fuel, fences, and necessary out-houses.

Subdivision 7 of section 5052 of Howell’s Statutes author-' izes the electors of the school district to impose a tax to keep the school-house in repair, and to provide.the necessary appendages and school apparatus; limiting said tax, however, so that it “ shall not exceed one-half the amount which the district is authorized to raise for building school-houses.”

If the items of fuel; fences, wells; and out-houses do not come properly within the term “ appendages,” then the district has no power, under the statute, to impose a tax to purchase or erect them.

It is claimed, under the statute last referred to by defendant’s counsel, that to give the director power to contract for the construction of a fence would give him authority greater than the electors of the district have, as they, are limited in such expenditures,-while his'discretion would be absolute. This argument cannot avail in the present case, as the district distinctly authorized the erection of the fence as it was built, and the expenditure was within the limit.' We do not wish to be understood as- deciding that the director would, in all cases, be authorized to' provide a fence, or to build it as he chose, without the assent or direction of the district.

• What we hold is this: the district is authorized to vote a tax to build a necessary appendage for a school-house.' In this case the fence was a necessary appendage. The district voted that it should be erected, and specified the manner in which it should be built, and the materials of which it should be com.posed. There is no provision of the statute conferring upon *109 the district officers, as a board, any authority to build a fence or provide necessary appendages; but the director is given the power to provide such appendages, and it is made his duty to do so; and we think he had a right to let the contract for this fence, and the district is liable for it.

It is further contended by the counsel for the defendant that, even if this fence can be considered a “ necessary appendage,” the power of the director to build it is confined by the statute to such time as school is being taught in the schoolhouse. There is no good reason for such a construction of the statute, as nearly all the things to be provided by the director ought to be on hand when school opens, and should be furnished or built beforehand. The comma in the statute correctly signifies the meaning of the clause. As it reads, there is no restriction upon the time of providing the appendages, but his duty to keep them, with the school-house, in good condition and repair, is confined to during the time “ school shall be taught therein.”

It is further urged, against the plaintiff’s right to recover, that he has mistaken his remedy ; that he should have proceeded by mandamus to compel the moderator to countersign hig order and the assessor to pay it..

This question is raised, as appears by the record, for the first time in this Court. It is too late now to interpose this obstacle in the plaintiff’s way. He had judgment in justice’s court, and the defendant appealed to the circuit, where the case was tried and disposed of irpon the theory that the director had no authority to make the contract. The defendant’s brief shows that this idea came after it was printed, and no mention of this defense is made in plaintiff’s brief ; his counsel not being present at the oral argument.

The defendant having defended in this action, without demurrer or protest as to the right of the plaintiff to proceed in assumpsit, it cannot-now take advantage of this claim, even though it might have been a good defense if raised in time.

The judgment below is reversed, and judgment will be entered here for the plaintiff for the sum of $30, and inter *110 ■est from the commencement, of suit, amounting, principal and interest, at this date, to. $31, with costs of all three •courts.

Campbell, C. J., and Sherwood, J., concurred. Champlin, •J., concurred in the result.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1903: 11906: 11923: 11952: 11974: 119032026peak 1903 · 1

Relies on it most ⓘ

  1. State ex rel. Burg v. Milwaukee Medical College106 N.W. 116 (Wis. 1906)
  2. Ennor v. Raine74 P. 1 (Nev. 1903)
  3. Fulk v. School Dist. No. 8 of Lancaster County53 N.W.2d 56 (Neb. 1952)
  4. LaPorte v. Escanaba Area Public Schools214 N.W.2d 840 (Mich. Ct. App. 1974)
  5. Commercial State Bank v. School District No. 3196 N.W. 373 (Mich. 1923)

Most recent

  1. LaPorte v. Escanaba Area Public Schools214 N.W.2d 840 (Mich. Ct. App. 1974)
  2. Fulk v. School Dist. No. 8 of Lancaster County53 N.W.2d 56 (Neb. 1952)
  3. Commercial State Bank v. School District No. 3196 N.W. 373 (Mich. 1923)
  4. State ex rel. Burg v. Milwaukee Medical College106 N.W. 116 (Wis. 1906)
  5. Ennor v. Raine74 P. 1 (Nev. 1903)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 1

DepthCaseCited by
Hemme v. Sch. Dist. No. 4, 30 Kan. 377 (1883) 16

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list