Wilcox Lumber Co. v. School District No. 268

WILCOX LUMBER COMPANY v. SCHOOL DISTRICT NO. 268 OF OTTER TAIL COUNTY

Wilcox Lumber Co. v. Sch. Dist. No. 268, 118 N.W. 794 (Minn. 1908)
Download
Format
Include

Star paging (*137) is kept for pin cites.

Court
Supreme Court of Minnesota · State Highest Courts
Decided
December 11, 1908
Docket
No. 15,843—(175)
Judges
Brown
Citations
118 N.W. 794106 Minn. 2081908 Minn. LEXIS 734
Disposition
Affirmed.
Headnotes
Failure to Take Bond of Contractor. In an action to recover from a school district a loss alleged to have been suffered by reason of the failure of the district officers to require of a contractor the bond provided for by chapter 321, Laws 1901, the evidence is held sufficient to support the verdict for defendant
Summary
Action in the district court for Becker county to recover $312.19, balance alleged to be due for material furnished to the contractor of defendant’s school building. The case was tried before Taylor, J., and a jury which rendered a verdict in favor of defendant. From an order denying its motion for a new trial, plaintiff appealed.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Brown

Text extracted by OCR from a scanned original; check the original for exact wording.

BROWN, J.

This cause was here on a former appeal ( 103 Minn. 43 , 114 N. W. 262 ), where the facts are fully stated. Defendant school district entered into a contract with one Phelps for the construction of a schoolhouse, but failed to take from him the bond required by the provisions of chapter 321, p. 535, Daws 1901, for the protection of laborers and materialmen.

We held on the former appeal that under the language of the statute the liability of the district was not absolute, but only to the extent of such loss as those entitled to rely upon the bond had suffered in consequence of the inability of the contractor to pay the obligations incurred by him in the prosecution of the work. The statutes provide that in case of a failure to require a bond the corporation shall be liable to those furnishing labor or material “to the extent of any loss they may incur by reason of said neglect.” In construing the *209 statute we further held that if the contractor was solvent no loss could result and the corporation was not liable, but if he was insolvent and could not be compelled to pay- by resort to legal proceedings then a loss followed within the statute, and the corporation was liable therefor. In reaching that conclusion we adopted the rule applicable to contracts of guaranty of collection of commercial paper, for no other rule seemed aptly to fit the situation. Plaintiff was required to show a “loss,” and this could only be done by evidence of its inability to collect from the contractor.

The cause was remanded for a second trial, on which the sole issue presented was the solvency or insolvency of the contractor. The court instructed the jury that if he was solvent at the time of or after the maturity of plaintiff’s claim, or then had money or property not exempt from execution which could have been reached by appropriate legal proceedings, plaintiff could not recover.

The assignments of error on this appeal present the single question whether the evidence sustains the verdict for the defendant. The jury must have found, within the instructions of the court,, that the contractor was either solvent or at least that he had money or property after the maturity of plaintiff’s claim out of which collection thereof could have been made. Our examination of the evidence, though it is not entirely satisfactory, leads to an affirmance. There is evidence in the record reasonably tending to show that soon after plaintiff’s claim became due the contractor had, to the knowledge of plaintiff, money on deposit in a bank, which he received from the defendant for the construction of the building, and which could have been reached had proceedings been commenced for that ¡purpose. But none were commenced, and the contractor thereafter withdrew the money, and then became wholly insolvent. He may have been insolvent all along, as insolvency is generally understood; but if plaintiff, as the evidence tends to show, permitted him to make away with the money received under the contract for tbe construction of the building, without an effort to intercept it, it is in no position to insist that defendant pay the amount a second time.

Order affirmed.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1916: 11922: 11992: 119162026peak 1916 · 1

Relies on it most ⓘ

  1. Green Electric System, Inc. v. Metropolitan Airports Commission486 N.W.2d 819 (Minn. Ct. App. 1992)
  2. C. A. Burton Machinery Co. v. Ruth186 S.W. 737 (Mo. Ct. App. 1916)
  3. Fargo Cornice & Ornament Co. v. School District No. 88188 N.W. 733 (Minn. 1922)

Most recent

  1. Green Electric System, Inc. v. Metropolitan Airports Commission486 N.W.2d 819 (Minn. Ct. App. 1992)
  2. Fargo Cornice & Ornament Co. v. School District No. 88188 N.W. 733 (Minn. 1922)
  3. C. A. Burton Machinery Co. v. Ruth186 S.W. 737 (Mo. Ct. App. 1916)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 1

DepthCaseCited by
Wilcox Lumber Co. v. Sch. Dist. No. 268, 114 N.W. 262 (Minn. 1907) 15

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list