The plaintiffs, being the owners of a tide-mill, authorized the defendants to maintain a bridge, resting on piles, across their mill-pond, and to modify the structure and supports in any way that might be deemed proper, to secure and preserve them, and released all damages on account of the bridge, and of any future modification of it; with a proviso, that if it should be so altered as to increase the damages to the mill-pond, by diminishing the quantity of -water, or otherwise impairing its efficiency, the plaintiffs should not be prejudiced in their claim for further damages. The plaintiffs subsequently released to the Portsmouth and Concord Railroad that part of the pond on which the bridge stood, bounding the premises released by the northerly side line of the bridge, saving and excepting all right, title, interest and privilege before conveyed to the defendants. The Portsmouth and Concord Railroad subsequently conveyed to the defendants the land under the bridge, with the right to fill up and make solid the space under it, and to slope the northern side of the embankment by a wall, or otherwise, into the mill-pond. The defendants filled in an embankment of earth about the piles under the bridge, which in filling in was allowed to run out to its natural slope, into the mill-pond, some distance beyond the northerly side line of the bridge: Held, that the embankment was such modification of the bridge as was intended by the parties in the release of damages from the plaintiffs; that the defendants, having proceeded to make the embankment upon the understanding expressed in the proviso, that the plaintiffs were not to be prejudiced in their claim for further damages, a promise to pay those damages was implied, and the plaintiffs might maintain assumpsit therefor; that the saving clause in the release from the plaintiffs to the Portsmouth and Concord Railroad was not such exception or reservation as preserved to the plaintiffs their right of action for the further damages occasioned by the embankment, so far as it was confined to the premises released to the Portsmouth and Concord Railroad; but that the right of action remained to them for the actual damages occasioned by the running out of the embankment into the mill-pond beyond the northerly side line of the bridge.
Summary
Assumpsit, in which the plaintiffs claim sncb damages as they reasonably deserve to have for the injury to their mill and privilege, at the North mill-pond, in Portsmouth, occasioned by the defendants, in altering, with the permission of the plaintiffs, their railroad structure across said pond, by throwing into it a large quantity of earth, and thereby displacing the water. The declaration alleges a promise by the defendants to pay said damages. The action was referred to a trial commissioner, who reported the following facts: In September, 1848, and long before and ever since, the plaintiffs were tenants in common and owners of the mill mentioned in the declaration, at the outlet of the North mill-pond, in Portsmouth, and of the privileges appertaining to said mill, being the same mill and privileges granted and conveyed by Gideon 'Walker to John Bowles, by deed of October 9,1802, “for the purposes of grinding bark and any other uses and purposes relating to tanning, or to the manufacturing of leather.” Said deed contains the following clause: “It is further agreed, that when the water is drawn out of said pond by the said parties, or their heirs or assigns, or either of them, until the top of a certain rock in said pond, southerly of said "Walker’s mills, shall appear, where there is the date of the present year, (1802) cut or ingraved; then when said rock and upper ingraving appears above water, then said Bowles, his heirs and assigns, if requested by said "Walker, his heirs, or assigns, shall cause his said mills to stop until the next tide, and no corn, wheat or grain is to be ground by said Bowles’ mill.” One "William Rand was, in 1843, and still is, owner of other mills on the same pond, which is mainly tide water, though helped somewhat by a stream of fresh water which flows into it. One George Raynes has a mill upon said pond, under a grant from said Rand, with gates, drawing about the same water as the plaintiffs’. At ordinary high tides the rock is covered about four feet deep. There has not always been water enough for all the mills, but usually they can all be run except in an extremely low Course of tides. The mills can all run about half the tide, or three hours, before the rock appears, and then about three hours more with less head of water. The Eastern Railroad Company, by then charter, are authorized to lay out their road not exceeding six rods in width. On the 8th day of October, 1843, the defendants having, with the consent of the plaintiffs, constructed their railroad over said pond, upon a bridge resting on piles driven nearly perpendicularly, two of the plaintiffs, to wit, Jeremiah D. and Moses H. Goodrich, executed, under their hands and seals, a release to the defendants of and from all damages and claims for damages which had arisen by reason of building and maintaining said railroad over said mill-pond, and ;all right to contest or question, either in law or equity, the authority or right of the defendants to construct and maintain or modify said railroad structure. The following provision is contained in the release: “We do hereby, for the consideration aforesaid, empower and authorize the said Eastern Railroad in New-Hampshire to modify and alter the structure and supports of said railroad in said mill-pond, in any way that may be deemed proper to secure and preserve the same, or to effect the purpose of said railroad; provided, that if the present structure of said railroad across said mill-pond shall be so altered as to increase the damages to said mill-pond, or parties, by diminishing the quantity of water in the pond, or impairing the efficiency thereof, the said Jeremiah and Mos.es are not to be prejudiced in their farther claim for any such increased damages.” The consideration expressed in the release is one hundred and forty-five dollars paid by the defendants, and in the preamble of the release it is recited that the releasors had agreed to receive said sum in full for all damages which had been occasioned by the construction of the railroad, and of all such as might arise from any modification of the structure. The two plaintiffs who did not execute said deed assented to the arrangement, and claimed no other damages than were paid to their brothers and co-tenants for the original injury by the railroad. On the 8th day of May, 1849, the plaintiffs executed a deed to the Portsmouth and Concord Railroad, whose track runs a few rods south-easterly of the said track of the Eastern Railroad across said pond, releasing and quit-claiming “all that part of the North mill-pond in said Portsmouth, which lies southerly or south-easterly of the northerly or north-westerly side lines of the Portsmouth and Concord Railroad, and of the Eastern Railroad in New-Hampshire, commencing on the northerly or northwesterly side line of said Portsmouth and Concord Railroad, at the Creek, so called, near land of Robert Ham, and following said line until it strikes that bridge of the Eastern Railroad in New-Hampshire which is situated next westerly from their dépót in Portsmouth; then following the northerly side line of said bridge until it strikes the easterly shore of said pond, at high-water mark, saving, excepting and reserving all rights, titles, interest and privileges which have been heretofore by us, or those under whom we claim, or any or either of us, conveyed to said Eastern Railroad in New-Hampshire; and it being further understood that said Portsmouth and Concord Railroad are to construct or cause to be constructed suitable and proper culverts to allow all the water running from the southerly or south-easterly shore of said pond into the same, freely to run into said pond, notwithstanding any embankment which may be made therein; and it being further understood that the space, or that part of said premises lying between the northerly side line of said Portsmouth and Concord Raili’oad and said northerly side line of said Eastern Railroad bridge, in said North mill-pond in New-Hampshire, and easterly of the point where the said northerly side line of said Portsmouth and Concord Railroad strikes said bridge, will not at present be used otherwise than as now used and occupied; and that whenever said space may be otherwise used or occupied, said Portsmouth and Concord Railroad shall, on demand, pay said grantors or their representatives the further sum of three hundred dollars,” the consideration named in said deed being fifteen hundred dollars. Said further sum of three hundred dollars was paid to the plaintiffs before any change was made in the use of said space by tbe Portsmouth and Concord Railroad, and said Eastern Railroad paid the same to said Portsmouth and Concord Railroad. On the 8th day of May, 1850, said Portsmouth and Concord Railroad, claiming under said deed, conveyed to said Eastern Railroad that part of the North mill-pond lying between the north side line of the Portsmouth and Concord Railroad, and the north side line of the Eastern Railroad bridge, “together with the land under said bridge, and the right to fill up and make solid the space under said bridge, and between said lines and to the land, when the same shall be so filled up and made solid, together with the right of sloping, by bank-wall or otherwise, the northern side of said embankment into said millpond.” In 1850 the defendants filled the space about their piles and under their bridge solid, so that the railroad now appears to rest on a solid bank of earth instead of a bridge, as at first constructed. The bridge was at first built by laying caps across the road on piles, and upon these caps stringers running lengthwise of the road. The caps projected about three inches outside of the stringers. In the filling, earth was dumped off the track, and allowed to run out to its natural slope, and was filled as high as the top of the stringers, so as to cover the caps. In some places the earth is a few inches further into the pond at the level of the top of the caps, than the caps are. The embankment is now, and was at the date of the writ, about nine or ten feet high, and several hundred feet in length. The slope is not far from forty-five degrees, and measures about fifteen feet upon its surface. Ordinary high water mark, when the water is four feet deep on the rock marked “1802,” is about mid way of said slope, or seven and a half feet out side of the piles of the bridge, so that if the defendants have not the right to a sloping bank, they have diminished the amount of water in the pond to the injury of the plaintiffs and the other owners, by the solid contents of a bank about 7J feet at the top, sloping at an angle of about forty-five degrees, and 4J to 5 feet in perpendicular height. No definite evidence was offered of the length of said embankment, or to that part of the track which was raised to a level. It is agreed by the parties that if the court should be of the opinion that the action could be maintained upon the facts reported, the damages should be assessed by a jury, or by an auditor; but if otherwise, the plaintiffs should become nonsuit.

Syllabus and headnotes are prepared by the reporter or publisher, not the court, and are not part of the opinion.

Opinion of the Court — Sawyer

Text extracted by OCR from a scanned original; check the original for exact wording.

Sawyer, J.

It may be assumed, that, by the release of September 8, 1843, executed by two of the plaintiffs, and the assent of the other two to the arrangement, with the defendants, as therein expressed, the Eastern Bailroad was licensed, or otherwise authorized to maintain and use their bridge as it then was, and were also empowered to modify the structure at any future time, in any way that the purposes of the corporation might require. No question is made, and there is perhaps no ground for raising a question, that the change in the character of the structure, from a bridge, supported on piles, to a solid embankment of earth, was such a modification of the structure as to come fairly within the meaning of the terms employed in the release. The release acknowledges the receipt of one hundred and forty-five dollars as the consideration paid therefor; and it contains, in addition, a recital in the preamble, that that sum, it was agreed, was to be received in full for all damages which had been occasioned by the construction of the bridge, and for any future damages which might arise from a modification of it. There is, however, a provision contained in the body of the release, that if the present structure shall be so altered as to increase the damages, by diminishing the quantity of water in the mill-pond, or impairing its efficiency, the plaintiffs are not to be prejudiced in their further claim for *162 the additional damages beyond the sum agreed upon. It is clear that the construction to be given to the instrument, upon a view of all its terms, is that the plaintiffs acknowledge satisfaction of all damages, past and prospective, arising from the bridge as it then was or as it might be by reason of any change of the structure, excepting only such additional damages as the alteration might occasion in diminishing the quantity of water, and impairing the efficiency of the pond to operate their mill. The release was not to prejudice their claim for these additional damages. All other damages which the alteration might occasion, as well as all which the bridge had caused, or might thereafter cause, in its then condition, were released, and the sum received in consideration of the release was paid in satisfaction of these damages. For the damages resulting from any future modification of the bridge, in diminishing the quantity of water, or impairing the efficiency of the pond, and for these only, the plaintiffs stipulated for further compensation, the amount of which was left indeterminate. If, then, without the grant by the plaintiffs of any further right, the defendants had proceeded to make the alteration, by substituting the solid embankment as the foundation for their superstructure, in place of the support by piles, and thereby further damages had been occasioned to the plaintiffs, in diminishing the capacity of the pond, or otherwise impairing its efficiency, the plaintiffs would have been entitled to further compensation, commensurate to the additional damages. And it is not perceived what remedy they would have had for recovery of that compensation, except by action of assumpsit upon the implied promise to pay such sum as might be a just remuneration for the injury. Whether the transaction might be regarded as a license by the plaintiffs to make the alteration, or whether it might he considered as amounting to a grant of the right — as upon a contract for a valuable consideration — in either view it was made *163 upon the express condition that the plaintiffs should be entitled to claim the additional compensation. The defendants, in exercising the right without further authority from the plaintiffs, must have been held to agree to the condition proposed. If the right to make the alteration rests upon the release executed by two of the plaintiffs, and the assent of the others to the arrangement therein expressed, the right must be exercised in conformity with the terms of the arrangement; and in the proceedings it is clearly implied that if the defendants choose to avail themselves of the right which it gives, they shall make just compensation for the additional damages. Having exercised the right upon that understanding, the promise to pay, sufficient to support the action of assumpsit, is implied.

Assuming, then, for the present, that the authority of the defendants to make the alteration is to be found only in the transaction of September, 1843, upon the facts stated, it is manifest that the plaintiffs may have sustained the additional damages contemplated. Their mill is operated mainly by tide-water. The supply of water received into the pond at each flood is exhausted by operating the mills upon it at each ebb. It is the right of the plaintiffs to operate their mill until the pond is drawn' down to a designated point; and this it is stated usually occurs at about half tide. They may then be required to suspend. It is obvious, therefore, that any cause which has the effect to contract the capacity of the pond, thereby diminishing the volume of water to be discharged during the ebb tide, must have the effect to abridge the time they may have the right to run their mill at each ebb, and thus to a greater or less extent impair its value.

There can be no doubt that the solid embankment, in place of the support by piles, diminishes the capacity of the pond and the volume of water; whether or.not to an appreciable extent, and to the damage of the plaintiffs, are *164 facts not stated in the report. If these facts exist, the plaintiffs’ right of action under that arrangement is clear. The question then arises, whether they have barred themselves from the right by any proceeding subsequent to the arrangement of September, 1843.

By their deed to the Portsmouth and Concord Railroad of the 8th of May, 1849, they released and quitclaimed a portion of the mill-pond described by definite boundaries. The release was executed before the acts complained of; and consequently, so far as those acts were confined to the limits of the premises released, the plaintiffs have no right to compensation for the loss of the water of the pond to the extent of those limits, unless it be in virtue of some exception or reservation to that effect, contained in the deed. Under this deed the grantees — the Portsmouth and Concord Railroad — as to these plaintiffs are to be considered the owners in fee of the territory included within the boundaries of the premises released, and they embrace, with other land, that also upon which the bridge stood as it was then constructed. The quitclaim by the plaintiffs of all right to a portion of the pond, marked by definite boundaries, leaves them at least no ground upon which to question that the party to whom they have released is entitled, as the owner, to occupy and enjoy the land in as full and ample manner as in the case of any owner of the fee under a deed of warranty, unless restrained by some provision contained in the deed. The description is of a part of the mill-pond. By the term ‘pond,’ the land covered with the water of the pond passes. In Co. Lit. 5, it is said, “if a man grant aquam suam, the soil shall not pass; but by the name stagnum — a pool, the water shall pass, and the land also. So gurges — a gulf, is water and land; and therefore by grant thereof by that name the soil doth pass.” The word pond is as effectual to pass the soil as pool or gulf.

*165 The Portsmouth and Concord Railroad, then, had the right, unless so restrained, to fill up- the pond through the whole extent of the portion released, including the ground occupied by the bridge; and they could convey to others, as against the plaintiffs, the title to the whole or any portion of the premises released, and with it the same right of raising the whole or any portion of the surface above the flow of the tide. This they did by their deed to the defendants of May 8, 1850, to the extent of the ground covered by the bridge in its then condition.

The question, then, to be considered is, whether the release from the plaintiffs to the Portsmouth and Concord Railroad contains any provisions limiting the rights which ordinarily attach upon a conveyance in fee, in the use and enjoyment of the land conveyed, and restraining them from filling up that portion of the pond occupied by the bridge. If they are not restrained, their grantees — the defendants — are not. The clause in the deed, which, it is claimed by the plaintiffs, amounts to such restriction, is in these words: “ Saving, excepting and reserving all rights, titles, interest and privileges which have been heretofore by us, or any or either of us, conveyed to said Eastern Railroad.” The rights and privileges here intended must be understood to be the right to maintain the bridge, and the right to modify it in any manner which the purposes of the corporation may require, upon making compensation to the plaintiffs for the actual damages. These rights, it may be conceded, had been conveyed by the plaintiffs to the defendants, and were thus within the terms of the exception; and the Portsmouth and Concord Road were consequently restrained from any use or enjoyment of the premises which would violate or impair the rights reserved to the Eastern Road. But they would be restrained no farther. These rights merely constituted an easement, and the Portsmouth and Concord Road took the estate subject to it. They were at liberty to devote *166 the land to any use, or occupy it in any way which would leave to the defendants the use of their bridge, and the privilege of modifying it as they might find occasion; and with their rights in this respect the filling up of the pond by the Portsmouth and Concord Road would have interfered in no way to which they could object. The substitution of a solid embankment for the water of the pond under the bridge, would not have interrupted the easement, nor rendered them less able to exercise the right of altering the bridge. If the purposes of the Portsmouth and Concord Road had required it, for their convenient use of the premises, they might have proceeded, even against the will of the Eastern Road, to make the embankment, within the limits of the premises released, precisely as it was made by the defendants; for it would not have been inconsistent with the enjoyment by them of their easement. If they could do it under the deed from the plaintiffs, they could empower the defendants to do it, also, by conveying the premises to them.

But if the Portsmouth and Concord Road should be held to be restrained from making the embankment, as against the Eastern Road, because it would be inconsistent with the enjoyment of the easement, still the plaintiffs have no claim for compensation, so far as relates to acts confined to the land released, upon other grounds, arising from the nature of the exception.

If any right is reserved to the plaintiffs under the clause in question, it is either because it in effect excepts some part of the thing granted from the operation of the grant, so that it does not pass by the demise — thus constituting a technical exception in the deed — or because it creates and reserves to the grantor a new right, not before in esse, and not a part of the thing granted, but springing from it, like rent or an easement reserved, and thus constituting a technical reservation.

*167 In 1 Shep. Touch. 77, an exception is'defined to he a clause in the deed whereby the grantor excepts somewhat out of that before granted; and it is said eveiy exception must be of part of the thing granted, capable of being severed from it, and not an inseparable incident; and “ such that he that doth except may have, and doth properly belong to him.” Instances given are a grant by one 'of all his lands in Essex, except or saving his lands in Dale, or all his lands in Dale, except a certain house. A reservation is said, p. 80, to be a clause whereby the grantor reserves some new thing to himself out of that which he has granted, but not part of it, nor a thing in esse, until created by the reservation. Such are a right of way, of fishery, or other incorporeal right, created at the time of the grant, and reserved to the grantor out of the land. In Co. Lit. 47, (b,) it is said, “ Note the diversity between an exception which is even part of the thing granted, and of a thing in esse, and a reservation, which is always of a thing not in esse, but newly created, or reserved out of the thing demised.” The distinction is recognized in Cocheco Manufacturing Co. v. Whittier, 10 N. H. 305; Thompson v. Gregory, 4 Johns. 81 .

If the clause, then, is to have the effect to retain to the plaintiffs, as against the operation of the quitclaim, the right to recover damages for filling up the pond beneath the bridge, it must be either because the land covered by the bridge is intended tobe excepted'in the use of the terms, — 1 excepting the rights, titles, interest and privileges conveyed to the Eastern Hoad’ —thus giving to the clause the character of a technical exception, exempting this land from the demise, or because it creates a new incorporeal right in the grantors, arising out of the land, not before in esse, like rent reserved, the easement of a way, or the like; and which, in this case, can be only the rights to modify, maintain, and use the bridge so modified. Either construction is alike inadmissible. To construe *168 the clause as an exception reserving the land, would be in effect to hold that a clause in a deed of land, with an existing public or private way upon it, excepting the way, would reserve to the grantor an estate in fee in the land occupied by the way. To construe it as the reservation of an easement would convert the easement described in the excepting clause as an existing right in the Eastern Railroad .into a new easement, thereafter to be held and enjoyed by the grantors. If the conveyance to the Portsmouth and Concord Road had been by deed of warranty, with the usual covenant against incumbrances, it would be manifest that the object and effect of the clause would be merely to except the easement from the operation of the covenant. In a naked quitclaim it may perhaps have the effect to impart notice to the grantees of the claim, of right made by the Eastern Road to maintain, modify and use the bridge, and of the transactions of 1843, upon which their claim is founded, and thus to secure them in equity, perhaps in law, against the interruption of the easement by the Portsmouth and Concord Road. It can have no effect and operation beyond this. Thus far the discussion has proceeded upon the assumption that the acts of the defendants in making the embankment were confined to the limits of the premises described in the release, and for these acts the plaintiffs have no claim for damages. But if, in filling in for the embankment, or otherwise modifying the structure of the bridge, they have passed beyond those limits, and thereby damages have been occasioned, the right of the plaintiffs to compensation rests upon the implied agreement to pay, under the arrangement of 1843; and as to these damages they have done nothing to bar themselves from maintaining this action therefor.

The boundary of the premises is described as the northerly side line of the bridge. By this must be understood the bridge as it was at the time of the conveyance. It is *169 described as constructed of timbers placed as stringers lengthwise of the road, upon transverse caps, resting on piles, and projecting on each side of the road some inches beyond the stringers. The projecting ends of the caps constituted the extreme points of the bridge laterally. A line from cap to cap on the northerly side of the bridge, touching their projecting ends, and continued to the eastern shore, would have left all parts of the foundation and superstructure upon its southerly side. Beyond this line there was nothing to indicate a limit as the northerly side line. The premises released are therefore bounded by that line. For any diminution of the capacity of the pond by the material placed in it beyond this boundary, in making the embankment and occasioning actual damages to the plaintiffs by impairing the use of their mill, the defendants are liable. This is to be determined upon an inquiry into the damages by the jury, or by an auditor, as provided in the case transferred.

How later courts describe this case

No later court has written an explanatory parenthetical about this case yet.

1993: 119932026peak 1993 · 1

Relies on it most ⓘ

  1. Nature Conservancy v. Kolb853 S.W.2d 864 (Ark. 1993)

Most recent

  1. Nature Conservancy v. Kolb853 S.W.2d 864 (Ark. 1993)

Citing references are not a citator: they show that a later opinion cites this case, not whether it followed, distinguished, or overruled it. Check negative history before relying on this case.

Authorities cited 1

DepthCaseCited by
Thompson v. Gregory, 4 Johns. 81 (N.Y. Sup. Ct. 1809) 24

Keyboard shortcuts

/Focus the search box
j kNext / previous result
EnterOpen the selected result
xAdd / remove the selected result from the download list
n pNext / previous search term in a case
cCopy the citation of the current case
+ −Larger / smaller reading text
?Show this list